Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit

Address 368 SW LAPAZ TER
LAKE CITY, FL 32024
Parcel #: 03181-001
Acres: 1.00
Owner: Robertson Richard A
Subdivision:
Zoning: RSF-2
Flood Zone: X
District: 5
Application #: 68822
Permit #: 000051965
Related Permit:
Submitted: Thursday, January 2, 2025
Issued: Friday, January 3, 2025
Expires: Thursday, January 23, 2025
Completed: Thursday, January 23, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0280D
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 2306
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? metal over existing shingles
Type of New Roofing Product Metal
Florida Product Approval Number FL-4595.15 R5
Product Manufacturer CAPITAL METALS
Product Description METAL 29 GA
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Second Roof Pitch (if applicable) 4:12 or Greater
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
1/2/2025 Application pending.
1/2/2025 Application submitted by applicant.
1/2/2025 Final Review - Payment Needed
1/3/2025 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Daniel Dufresne
Covenant Roofing & Construction Inc
CCC1332763 Cert. Roofing Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - In Progress Work In Progress, Please Provide Photos Per Your Affidavit Gary Pitzer 1/21/2025
Passed: Re-Roof - Final Troy Crews 1/23/2025
Documents
File Name Date File Size