Permit Details

Permit Search

Permit

Storage Building

724 SW SILOAM ST
LAKE CITY, FL 32024

Permit #
000051947
Application #
68097
Status Completed
  1. Submitted Nov 13, 2024
  2. Issued Dec 31, 2024
  3. Expires Sep 10, 2025
  4. Completed Mar 17, 2025

Property

Parcel #
00439-102
Owner
Pitkin Robert M, Pitkin Lorrie A
Acres
5.01
Subdivision
Siloam Crossing
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Non-Habitable Structure
Fema map number
12023C0360C
Type of Structure
Storage Building
Commercial or Residential?
Residential
Total Area (Sqft)
1600
Septic# (00-0000) or (X00-000)
x24-134
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setback Rear
10' (accessory)
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
non-habitable
Dev Permit #
F023-
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height
12'
Building Length
40'
Building Width
40'
Service Amps
400
Slab
New
Mechanical
No
Electrical
Yes
Plumbing
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Documents Required
  6. Plan Review - On Hold-Incomplete
  7. Plan Review - On Hold-Incomplete
  8. Plan Review - Reviewed
  9. Final Review - Documents Required
  10. Final Review - Payment Needed
  11. Permit Issued

Contractors

This is an owner-builder project.

  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor

Inspections

  1. Dec 27, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Jan 7, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  3. Jan 7, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  4. Mar 14, 2025

    Passed: Building - Final

    Inspected by Matt Forsyth

  5. Mar 14, 2025

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  6. Mar 17, 2025

    Release to power company

    Inspected by Matt Forsyth