| Failed: Electrical - Permanent Power |
Service Requires A Secondary For Of Ground, To Be Spaced At Least 6 Ft Apart With Continuous Ground Wire Between Them, In This Case You Will Need A Secondary Ground Wire To A Second Ground Rod, Also Need To Drive Them To Finish Grade |
Gary Pitzer |
6/9/2025 |