| Passed: Fire - Plan Review |
|
Cpt. Shane Overstreet |
11/5/2024 |
| Passed: Electrical - Permanent Power |
Need Final Driveway Inspection For Release |
Troy Crews |
12/23/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
1/9/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
1/9/2025 |
| Cancelled: Engineering - Final Driveway |
Inspection Requested On Wrong Permit |
Melissa Garber |
1/16/2025 |
| Release to power company |
Tc Ok'd Per Chad Williams |
Melissa Garber |
1/17/2025 |
| Passed: Electrical - Above Ceiling |
|
Troy Crews |
2/12/2025 |
| Passed: Plumbing/Gas - Sanitary |
|
Troy Crews |
2/12/2025 |
| Passed: Building - Final |
Drive Constructed As Permitted, But The Outfall Of The Side Drain Has Some Erosion That Needs To Be Repaired-- Chad Spoke With Owner, Who Stated They Would Correct. Co Pending Final Ok From County Engineer-- 5.18.25 Mg-- Ok Per Chad-- 7.1.25 Mg |
Troy Crews |
3/13/2025 |