Permit Details

Permit Search

Permit

New Residential Construction

637 NW RODEO CT
LAKE CITY, FL 32055

Permit #
000051887
Application #
68041
Status Completed
  1. Submitted Nov 18, 2024
  2. Issued Dec 19, 2024
  3. Expires Mar 16, 2026
  4. Completed Sep 17, 2025

Property

Parcel #
02383-101
Owner
Little Bryan William, Little Yvette Escalante
Acres
35.13
Subdivision
—
Zoning
RSF-2
Flood zone
A
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Special Flood Hazard Area
Finished floor requirement
2' above adjacent grade per engineer letter NA
Requirement needed
By Final Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
12023C0280D
Water source
Suwannee
In floodway
N
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2862
Total Area (Sqft)
3833
Building Height
22.4
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0852
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Processing
  4. Point Review - On Hold-Incomplete
  5. Point Review - Printed-Online Application
  6. Zoning Review - Documents Required
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Zoning Review - Reviewed
  14. Final Review - Payment Needed
  15. Permit Issued
  16. Zoning Review - Reviewed
  17. Zoning Review - Corrections Needed
  18. Zoning Review - Reviewed
  19. Final Review - Payment Needed
  20. Final Review - Complete

Contractors

  • Hugo Escalante

    Ewpl,inc.

    License
    CBC1257908
    Title
    Building Contractor
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Marcus Matthews

    Matthews Electric Llc

    License
    EC13005459
    Title
    Electrical Contractor
    Role
    Subcontractor

Inspections

  1. Dec 20, 2024

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  2. Dec 20, 2024

    Release to power company

    Inspected by Matt Forsyth

  3. Jan 6, 2025

    Failed: Building - Footer

    Gate Locked.

    Inspected by Troy Crews

  4. Jan 6, 2025

    Failed: Engineering - Setbacks

    Inspected by Troy Crews

  5. Jan 6, 2025

    Passed: Building - Footer

    Inspected by Troy Crews

  6. Jan 6, 2025

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  7. Feb 14, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv Only

    Inspected by Matt Forsyth

  8. Feb 18, 2025

    Passed: Electrical - 1st Underground Rough–In

    Inspected by Troy Crews

  9. Feb 25, 2025

    Cancelled: Building - Footer

    Inspected by Emaleigh Williams

  10. Feb 25, 2025

    Cancelled: Engineering - Setbacks

    Inspected by Emaleigh Williams

  11. Feb 25, 2025

    Cancelled: Building - Footer

    Inspected by Emaleigh Williams

  12. Feb 25, 2025

    Cancelled: Engineering - Setbacks

    Inspected by Emaleigh Williams

  13. Feb 25, 2025

    Cancelled: Building - Footer

    Inspected by Emaleigh Williams

  14. Feb 25, 2025

    Cancelled: Engineering - Setbacks

    Inspected by Emaleigh Williams

  15. Feb 26, 2025

    Passed: Building - Slab

    Inspected by Troy Crews

  16. Mar 13, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Proper Nails Are Screws Need To Be Used On Base Plates Of Post

    Inspected by Matt Forsyth

  17. Mar 13, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  18. Mar 13, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  19. Mar 18, 2025

    Passed: Building - Framing

    Partial Framing

    Inspected by Matt Forsyth

  20. Mar 18, 2025

    Cancelled: Building - Rated Assembly Fastening

    Inspected by Matt Forsyth

  21. Mar 18, 2025

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  22. Apr 22, 2025

    Passed: Building - Framing

    Inspected by Matt Forsyth

  23. Apr 22, 2025

    Passed: Building - Rated Assembly Fastening

    Commercial Attachment For Windows And Doors

    Inspected by Matt Forsyth

  24. Apr 22, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  25. Apr 22, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  26. Apr 22, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Behind Wall Supply For Gas

    Inspected by Matt Forsyth

  27. Apr 22, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tubs Have Been Water Tested

    Inspected by Matt Forsyth

  28. Apr 29, 2025

    Passed: Building - Insulation

    Inspected by Matt Forsyth

  29. May 16, 2025

    Septic Release Inspection

    Inspected by Health Dept

  30. Sep 16, 2025

    Release to power company

    Ok To Release Power-- 9.16.25 Mg

    Inspected by Ewilliams

  31. Sep 16, 2025

    Release to power company

    Ok To Release Power-- 9.16.25 Mg

    Inspected by Ewilliams

  32. Sep 16, 2025

    Passed: Electrical - Permanent Power

    Ok To Release Power-- 9.16.25 Mg

    Inspected by Matt Forsyth

  33. Sep 16, 2025

    Submitted Power Release through FPL Portal

    Inspected by Garber, Melissa

  34. Sep 17, 2025

    Passed: Building - Final

    All Requirements Met To Release Co-- 9.17.25 Mg

    Inspected by Matt Forsyth

  35. Requested

    Engineering - As-Built Survey Review

    Awaiting inspection

Documents