Roof Replacement or Repair
Permit
| Application #: | 68665 |
| Permit #: |
000051874 |
| Related Permit: |
|
| Submitted: | Tuesday, December 17, 2024 |
| Issued: | Wednesday, December 18, 2024 |
| Expires: | Wednesday, February 19, 2025 |
| Completed: | Wednesday, February 19, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0167D |
| Type Roofing Job |
Overlay with Metal |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
0.00 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
install metal over existing roof material w/ 1x4's FL 36904.1 R11 |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL 36904.1 R11 |
| Product Manufacturer |
Tri County Metals |
| Product Description |
Ultra Rib |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
install metal over existing roof material w/ 1x4's FL 36904.1 R11 |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 12/17/2024 |
Application pending. |
| 12/17/2024 |
Application submitted by applicant. |
| 12/17/2024 |
Final Review - Corrections Needed |
| 12/17/2024 |
Final Review - Corrections Needed |
| 12/17/2024 |
Final Review - Payment Needed |
| 12/18/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Benjamin T Keeler Keeler Roofing, Llc
|
CCC1330509 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Photos Show Furring Stips With Metal Roof Covering Overlay, No Answer At Door, Vo |
Gary Pitzer |
2/18/2025 |
| Passed: Re-Roof - Final |
Competed At Time Of Ip Inspection, Vo Metal Roof Covering |
Gary Pitzer |
2/19/2025 |