| Inspection |
Notes |
Performed By |
Date |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv Only, No Clean Out |
Gary Pitzer |
2/17/2025 |
| Cancelled: Building - Slab |
|
Melissa Garber |
2/24/2025 |
| Passed: Building - Slab |
Plastic And Taped, Electric Conduits For Future Use And Floor Outlets |
Gary Pitzer |
2/25/2025 |
| Passed: Engineering - Setbacks |
In Large Field |
Gary Pitzer |
2/25/2025 |
| Passed: Building - Footer |
2#5 Rebar On Chairs, Please Post Address At First Gate |
Gary Pitzer |
2/25/2025 |
| Cancelled: Re-Roof - In Progress |
|
Gary Pitzer |
4/15/2025 |
| Passed: Building - Roof Decking |
|
Gary Pitzer |
4/15/2025 |
| Passed: Building - Wall Sheathing |
|
Gary Pitzer |
4/15/2025 |
| Passed: Electrical - Temporary Service |
60 Amp Temp. Service With Well Power And 1 Gfci Outlet |
Gary Pitzer |
4/25/2025 |
| Release to power company |
|
Gary Pitzer |
4/25/2025 |
| Failed: Plumbing/Gas - 2nd Rough-In |
1. Proper Protection Plates For Flex Gas Line, 2. Air Test On Gas Line, 3. Seal Around Water Line Where The Line Enters In Foundation |
Gary Pitzer |
5/14/2025 |
| Failed: Electrical - 2nd Rough-In |
Exhaust Fans Not Wired |
Gary Pitzer |
5/14/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
5/21/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
Check Pipe Entry Next Inspection |
Gary Pitzer |
5/21/2025 |
| Passed: Building - Insulation |
Walls R-13 Batt, Attic Spray Foam |
Anthony Aslan |
7/30/2025 |
| Passed: Building - Spot Check |
Permanent Power Coming Soon |
Troy Crews |
1/14/2026 |
| Passed: Electrical - Permanent Power |
Need Final Septic |
Troy Crews |
1/30/2026 |
| Release to power company |
|
Troy Crews |
1/30/2026 |
| Septic Release Inspection |
|
Health Dept |
2/5/2026 |
| Passed: Building - Final |
Need Blower Door Test For Release Any Gas Appliances Should Be Started Up By Gas Supplier |
Troy Crews |
2/6/2026 |
| Passed: Certificate - Release Certificate |
Blower Door Recieved |
Crews, Malcolm T. |
2/6/2026 |