Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Roof Replacement or Repair Permit
Address 312 NW TURNBERRY DR
LAKE CITY, FL 32055
Parcel #: 02376-000
Acres: 35.71
Owner: Five Ash Forest Llc
Subdivision:
Zoning: RSF/MH-2
Flood Zone: X
District: 3
Application #: 68645
Permit #: 000051846
Related Permit:
Submitted: Monday, December 16, 2024
Issued: Monday, December 16, 2024
Expires: Friday, March 28, 2025
Completed: Friday, March 28, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Type Roofing Job Overlay with Metal
Type of structure Mobile Home
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 20
No. of Stories 1
Ventilation: Ridge Vent
Drip Edge: Replace All
Roof Pitch 4:12 or Greater
Is the existing roof being removed? No
Explain if not removing the existing roofing material? overlay
Type of New Roofing Product Metal
Florida Product Approval Number 36904.2
Product Manufacturer tricounty
Sealed roof decking options: (Must select an option.) Other (explain)
Sealed roof decking explanation for other option. overlay
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Fema map number 12023C0280D
Review Notes
12/16/2024 Permit Issued Permit #000051846 created and approved.
Contractors
Name/ Business License Title Role
Donald L Richardson Jr
Richardson Roofing, Llc
Liability Insurance Expired.
CCC1330817 Cert. Roofing Contractor
Inspections
Inspection Notes Performed By Date
Passed: Re-Roof - Final Troy Crews 3/28/2025
Cancelled: Re-Roof - In Progress Troy Crews 3/28/2025