Right-of-Way Access/Driveway
Permit
| Application #: | 68278 |
| Permit #: |
000051804 |
| Related Permit: |
911 Address Application: |
| Submitted: | Thursday, November 21, 2024 |
| Issued: | Thursday, December 12, 2024 |
| Expires: | Tuesday, December 9, 2025 |
| Completed: | Tuesday, December 9, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0360C |
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Mobile Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Construction Material Type |
Limerock/Gravel/Millings |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
Review Notes
| 11/21/2024 |
Pending applicant completion and submission. |
| 11/29/2024 |
Email confirmation reminder sent. |
| 12/2/2024 |
Application submitted by applicant. |
| 12/2/2024 |
Pending Public Works Application Approval |
| 12/6/2024 |
Application Approved by Public Works |
| 12/6/2024 |
Final Review - Payment Needed |
| 12/9/2024 |
Pending initial driveway inspection |
| 12/12/2024 |
Permit Issued |
| 12/16/2024 |
New address issued and ticket completed. |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Patrick Weaver |
12/2/2024 |
| Passed: Engineering - Initial Driveway |
|
Beach, Garrett |
12/10/2024 |
| Passed: Engineering - Driveway Spot Check |
Driveway Is Complete. |
Beach, Garrett |
6/11/2025 |
| Passed: Engineering - Final Driveway |
|
Beach, Garrett |
12/9/2025 |