Search pages and services on the county website.
Choose the colors you prefer.
Permit
1101 SW HIGH FIELD TERLAKE CITY, FL 32024
This is an owner-builder project.
Stephen M Brisbois
Epic Ac Service (dba) Central Home Heating & Air Llc
Passed: Plumbing/Gas - 1st Underground Rough–In
Dwv Only No Water
Inspected by Gary Pitzer
Passed: Engineering - Setbacks
Passed: Building - Monolithic Slab
3 # 5 Rebar In Footer, Wire In Slab, Plastic
Passed: Building - Vertical Cells/Columns
Cancelled: Building - Roof Decking
Passed: Building - Roof Decking
Ply Wood, Small Area Finishing
Passed: Building - Framing
Rescheduled 7/3/2025:Building - Strapping
Inspected by Troy Crews
Passed: Building - Strapping
Passed: Mechanical - Rough In
Passed: Plumbing/Gas - Tub Set/Shower Pan
Passed: Electrical - 1st Underground Rough–In
Passed: Building - Insulation
Walls Are The Poured Foam Block And Attic Is Blown
Passed: Electrical - Permanent Power
Release to power company
Passed: Building - Final
All Requirements Met To Release Co-- 5.13.26 Mg
Septic Release Inspection
Inspected by Health Dept