Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 137 SW ROUNDTABLE CT
LAKE CITY, FL 32024
Parcel #: 03099-114
Acres: 0.51
Owner: Happy Land Development Llc,
Subdivision: Stonehenge Phase 1
Zoning: RSF-2
Flood Zone: X
District: 3
Application #: 67881
Permit #: 000051743
Related Permit: Right-of-Way Access/Driveway: 000051391
Submitted: Wednesday, October 30, 2024
Issued: Monday, December 9, 2024
Expires: Wednesday, September 24, 2025
Completed: Wednesday, September 24, 2025
Status: Completed
Septic Release? Yes
Notes:
MFE = 12" ABOVE ADJACENT GROUND FOR ENTIRE PERIMETER OF THE FOUNDATION
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City does not provide utilities to this location.
Job Details
Elevation regulation Engineers Elevation Letter
Finished floor requirement 12" above adjacent ground for entire perimeter
Fema map number 12023C0293D
This is the construction of a Single Family Dwelling
Setbacks Front 25'
Setback Side 1 10'
Setback Side 2 10'
Setbacks Rear 15'
Stories 1
Heated Area (Sqft) 1551
Total Area (Sqft) 2340
Building Height 25
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0781
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
10/30/2024 Application pending.
10/30/2024 Application submitted by applicant.
10/30/2024 City of Lake City Utilities Notified.
10/31/2024 Point Review - Printed-Online Application
10/31/2024 Point Review - Reviewed
10/31/2024 Zoning Review - Reviewed
11/4/2024 Plan Review - Building Approved
11/4/2024 Plan Review - Electrical Approved
11/4/2024 Plan Review - Mechanical Approved
11/4/2024 Plan Review - Plumbing Approved
11/4/2024 Plan Review - Fuel/Gas Approved
11/4/2024 Plan Review - Reviewed
11/14/2024 Zoning Review - Documents Required
12/9/2024 Zoning Review - Reviewed
12/9/2024 Final Review - Reviewed
12/9/2024 Final Review - Payment Needed
12/9/2024 Permit Issued
5/14/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Drew Worthmann
Happy Home Construction Llc
CGC1527385 Cert. General Contractor
Drew T Worthmann
Happy Home Construction Llc
CFC1429369 Cert. Plumbing Subcontractor
Drew Worthmann
Happy Home Construction Llc
Employees Workers Comp Expired.
CCC1334454 Cert. Roofing Subcontractor
Drew Worthmann
Happy Home Construction Llc
CMC1250473 Cert. Mechanical Subcontractor
James Quinn
Craft Electric Inc
EC13010994 Cert. Electrical Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Plumbing/Gas - 1st Underground Rough–In Test Stack Needs To Be On The Highest Fixture Nothing But Air On The High End Of Waste Pipe Matt Forsyth 1/6/2025
Passed: Plumbing/Gas - 1st Underground Rough–In Need Compaction Test For Slab Placement Matt Forsyth 1/7/2025
Passed: Building - Slab Fiber Mesh Concrete Matt Forsyth 1/9/2025
Cancelled: Building - Roof Decking Matt Forsyth 1/23/2025
Cancelled: Building - Strapping Matt Forsyth 1/23/2025
Cancelled: Building - Wall Sheathing Matt Forsyth 1/23/2025
Passed: Building - Roof Decking Gary Pitzer 1/29/2025
Passed: Building - Strapping Gary Pitzer 1/29/2025
Passed: Building - Wall Sheathing Gary Pitzer 1/29/2025
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 2/19/2025
Passed: Electrical - 2nd Rough-In Matt Forsyth 2/19/2025
Failed: Mechanical - Rough In Duck Work Thru Ceiling Needs Three Inch Clearance From Framing Members Matt Forsyth 2/19/2025
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 2/19/2025
Passed: Plumbing/Gas - Tub Set/Shower Pan Matt Forsyth 2/19/2025
Failed: Building - Framing Attic Access Not Found Matt Forsyth 2/19/2025
Passed: Building - Insulation Matt Forsyth 2/24/2025
Passed: Building - Framing Matt Forsyth 2/24/2025
Passed: Mechanical - Rough In Matt Forsyth 2/24/2025
Failed: Electrical - Permanent Power Not Finished At Metercan Need Septic Release Matt Forsyth 4/23/2025
Passed: Electrical - Permanent Power Septic(rec'd) And Drive Final Needed Prior To Release Of Power-- 6.6.25 Mg Matt Forsyth 5/2/2025
Septic Release Inspection Health Dept 6/9/2025
Release to power company Rec'd Septic And Drive Final Emaleigh Williams 6/18/2025
Cancelled: Electrical - Permanent Power Matt Forsyth 8/12/2025
Cancelled: Engineering - As-Built Survey Review Melissa Garber 8/18/2025
Passed: Electrical - Permanent Power Power Already On, Need To Secure Erosion On South Side And Rear Of Home Prior To Final Troy Crews 8/26/2025
Failed: Building - Final House Locked Troy Crews 9/8/2025
Failed: Building - Final Termite Treatment Matt Forsyth 9/9/2025
Passed: Certificate-Release Certificate Forsyth, Matthew C. 9/24/2025
Passed: Building - Final Termite Treatmentfinal Inspection Complete. Permit Under Office Review For Co Eligibility. Matt Forsyth 9/24/2025