Permit Details

Permit Search

Permit

New Residential Construction

207 SW ROSE POINTE PL
LAKE CITY, FL 32024

Permit #
000051729
Application #
67412
Status Completed
  1. Submitted Oct 8, 2024
  2. Issued Dec 6, 2024
  3. Expires Feb 15, 2026
  4. Completed Aug 19, 2025

Property

Parcel #
03011-105
Owner
Gator Land Development, Llc,
Acres
0.30
Subdivision
Rose Pointe
Zoning
PRD
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
105.0'
Requirement needed
By Nailing Inspection
Document needed is
a Surveyor letter giving the Finished Floor Elevation
Document receieved
Yes
Fema map number
12023C0289D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
1000
Total Area (Sqft)
1390
Building Height
15
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0817
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Point Review - On Hold-Incomplete
  5. Point Review - Printed-Online Application
  6. Zoning Review - Reviewed
  7. Plan Review - Building Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Mechanical Approved
  10. Plan Review - Plumbing Approved
  11. Plan Review - Fuel/Gas Approved
  12. Plan Review - Reviewed
  13. Final Review - Documents Required
  14. Final Review - Documents Required
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Payment Needed
  18. Final Review - Complete

Contractors

  • Joseph C Peurrung

    Benchmark Builders Llc

    License
    CBC1259347
    Title
    Cert. Building
    Role
    Contractor
  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor
  • Robert Jarvis

    Jarvis Heat And Air Llc

    License
    CAC1816766
    Title
    Class "b" A/c
    Role
    Subcontractor

    County License & State License Expired.

  • Alaina Perry

    North Florida Maintenance And Repair Services Llc

    License
    ER13016315
    Title
    Reg. Electrical
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor

Inspections

  1. Feb 3, 2025

    Passed: Building - Footer

    Inspected by Matt Forsyth

  2. Feb 3, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Mar 11, 2025

    Failed: Plumbing/Gas - 1st Underground Rough–In

    No Permit Posted On Building Site With Noc Water Test Needs To Be On High End Of Fixtures Served

    Inspected by Matt Forsyth

  4. Mar 12, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Item Was Addressed

    Inspected by Matt Forsyth

  5. Mar 20, 2025

    Passed: Building - Slab

    Inspected by Matt Forsyth

  6. Apr 10, 2025

    Passed: Building - Framing

    Partial Framing Please Reschedule When Windows And Doors Installed

    Inspected by Matt Forsyth

  7. May 5, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  8. May 5, 2025

    Passed: Building - Rated Assembly Fastening

    Inspected by Matt Forsyth

  9. May 5, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  10. May 5, 2025

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  11. May 5, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  12. May 5, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  13. May 5, 2025

    Passed: Mechanical - Rough In

    Flex Duct Through Ceiling

    Inspected by Matt Forsyth

  14. May 5, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  15. May 5, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Water Tested

    Inspected by Matt Forsyth

  16. May 13, 2025

    Passed: Building - Insulation

    Spray Foam Walls And Ceiling

    Inspected by Matt Forsyth

  17. Jul 29, 2025

    Failed: Building - Final

    Fresh Air Supply Register Not Located. Hvac Condensate Line Dripping Toward House. Gfci Receptacles In Kitchen Will Not Reset Need Septic Release & Drive Final

    Inspected by Matt Forsyth

  18. Aug 5, 2025

    Passed: Electrical - Permanent Power

    Need Septic Release

    Inspected by Matt Forsyth

  19. Aug 13, 2025

    Release to power company

    Inspected by Ewilliams

  20. Aug 13, 2025

    Septic Release Inspection

    Inspected by Health Dept

  21. Aug 18, 2025

    Passed: Building - Final

    Blower Door Test Reviewed Make Up Air Confirmed-- Assessments Must Be Paid Prior To Co-- 8.18.25 Mg, Assessments Paid

    Inspected by Matt Forsyth

  22. Aug 19, 2025

    Passed: Certificate-Release Certificate

    Rec'd Blower Door And Air Makeup - Assessments Paid

    Inspected by Matt Forsyth

Documents