Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit

Address 1608 SW TOMMY LITES ST
Parcel #: 09688-001
Acres: 14.35
Owner: Hubler Blair David, Hubler Houston J
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 68243
Permit #: 000051728
Related Permit: New Residential Construction: 000051733
Submitted: Wednesday, November 20, 2024
Issued: Friday, December 6, 2024
Expires: Tuesday, December 2, 2025
Completed:
Status: Permit Issued
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0381D
What is the power service for? Other
Other job details: generator install
Power Company Clay Electric
Septic # (00-0000) or (X00-000) x22
Electrical Code Edition 2017 National Electrical Code
Number of requested AMPS for electrical service: 100
Is the power service? Generator Install
Residential or Commercial? Residential
Review Notes
11/25/2024 Application submitted by applicant.
11/25/2024 Pending Public Works Application Approval
12/6/2024 Application Approved by Public Works
12/6/2024 Final Review - Payment Needed
12/6/2024 Pending initial driveway inspection A initial driveway inspection was automatically scheduled from payment.
12/6/2024 Permit Issued Permit #000051728 created and approved.
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Cancelled: Engineering - ROW Access/Driveway connects to county maintained road Melissa Garber 12/4/2024
Passed: Engineering - ROW Access/Driveway connects to county maintained road Patrick Weaver 12/5/2024
Passed: Engineering - Initial Driveway Smith, Blake 12/6/2024
Passed: Engineering - Driveway Spot Check Home Is Under Construction Smith, Blake 6/5/2025
Documents
File Name Date File Size