Permit Details

Permit Search

Permit

New Residential Construction

228 NW SAULSBY GLN
LAKE CITY, FL 32055

Permit #
000051652
Application #
67247
Status Completed
  1. Submitted Oct 15, 2024
  2. Issued Nov 26, 2024
  3. Expires Feb 8, 2026
  4. Completed Aug 12, 2025

Property

Parcel #
00127-013
Owner
Taylor Deborah S,
Acres
5.01
Subdivision
—
Zoning
A-3
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0170D
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Heated Area (Sqft)
1685
Total Area (Sqft)
2365
Building Height
19
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0773
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Reviewed
  4. Point Review - Printed-Online Application
  5. Plan Review - Corrections Needed
  6. Plan Review - Plumbing Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Building Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Processing
  12. Final Review - Processing
  13. Final Review - Reviewed
  14. Final Review - Payment Needed
  15. Final Review - Payment Needed
  16. Permit Issued
  17. Final Review - Complete

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Robert Ogles

    Ogles Roofing & Construction Llc

    License
    CCC1328699
    Title
    Cert Roofing
    Role
    Subcontractor

    County License & State License Expired.

Inspections

  1. Dec 5, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  2. Dec 5, 2024

    Passed: Building - Footer

    Inspected by Gary Pitzer

  3. Jan 29, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Dwv, No Clean Out

    Inspected by Gary Pitzer

  4. Feb 3, 2025

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  5. Feb 3, 2025

    Release to power company

    Inspected by Matt Forsyth

  6. Feb 7, 2025

    Failed: Building - Slab

    All Hooked Bars Need To Be Properly Bent Down Into The Slab All Perimeter Number 5 Bar Needs To Be Chaired Up Minimum Three Quarters Of An Inch Away From Any surface For Proper Concrete Consolidation

    Inspected by Matt Forsyth

  7. Feb 10, 2025

    Passed: Building - Slab

    Inspected by Matt Forsyth

  8. Mar 13, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Mar 13, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  10. Apr 7, 2025

    Passed: Building - Framing

    Inspected by Gary Pitzer

  11. Apr 7, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Gary Pitzer

  12. Apr 14, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  13. Apr 14, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  14. Apr 14, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Matt Forsyth

  15. Apr 22, 2025

    Passed: Building - Insulation

    Wall Insulation Only Inspected

    Inspected by Matt Forsyth

  16. Jun 4, 2025

    Passed: Electrical - Permanent Power

    Septic Needed

    Inspected by Matt Forsyth

  17. Jun 20, 2025

    Release to power company

    All Requirements Met To Release Power-- 6.20.25 Mg

    Inspected by Melissa Garber

  18. Jun 20, 2025

    Septic Release Inspection

    Inspected by Health Dept

  19. Aug 8, 2025

    Passed: Building - Final

    Blower Door Submitted And Reviewed Final Termite Treatment Documentedfinal Inspection Complete. Permit Under Office Review For Co Eligibility.

    Inspected by Matt Forsyth

  20. Aug 12, 2025

    Passed: Certificate-Release Certificate

    Rec'd Blower Door And Termite

    Inspected by Matt Forsyth

Documents