Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 390 SE BEAR RUN ST
LAKE CITY, FL 32025
Parcel #: 08332-062
Acres: 1.00
Owner: Coon Phillip, Coon Miranda
Subdivision: Price Creek Acres Unit 3 Unr
Zoning: A-3
Flood Zone: X
District: 4
Application #: 67870
Permit #: 000051628
Related Permit:
Submitted: Wednesday, October 30, 2024
Issued: Monday, November 25, 2024
Expires: Friday, December 13, 2024
Completed: Friday, December 13, 2024
Status: Completed
Septic Release? Yes
Notes:
ENGINEER LETTER STATES THE FINISHED FLOOR ELEVATION OF THE HOME SHALL BE 32” ABOVE THE ADJACENT GROUND FOR THE ENTIRE PERIMETER OF THE FOUNDATION.
LAKE CITY UTLITY CUSTOMER SERVICE NOTES The City of Lake City does not provide utilities to this location.
Job Details
Mobile Home is a: Double Wide
Year Built 2025
How many of bedrooms does this home have? 3
How many bathrooms does this home have? 2
Width (Ft.In) 28
Length (Ft.In) 48
Wind Zone? 2
Serial # LOHGA30074726AB
Installation Decal # 108534
Service Amps 200
Residential or Commercial Use? Residential
Driveway access to home: Existing Drive
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 24-0799
Dev Permit # F023-
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Elevation regulation Engineers Elevation Letter
Finished floor requirement 32" above grOUND FOR ENTIRE PERIMETER
Fema map number 12023C0315C
Review Notes
10/30/2024 Application pending.
10/30/2024 Application submitted by applicant.
10/30/2024 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
10/31/2024 Point Review - Printed-Online Application NEEDED * RUSTY L KNOWLES UPDATED STATE LICENSE AND WORKERS COMP * ENVIRONMENTAL HEALTH SIGNED SITE PLAN
11/7/2024 Zoning Review - Reviewed NEEDED: ***PLEASE REFRAIN FROM UPLOADING DOCUMENTS THAT CONTAIN SENSITIVE INFORMATION SUCH AS SOCIAL SECURITY NUMBERS, ETC... DOCUMENTS ARE PUBLIC RECORD * ENVIRONMENTAL HEALTH SIGNED SITE PLAN
11/7/2024 Plan Review - Reviewed NEEDED: * ENVIRONMENTAL HEALTH SIGNED SITE PLAN *ADDRESS CONFIRMATION-- MG WORKING ON ***THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION OF THE PROPOSED STRUCTURES LOWEST BEAM. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE PROPOSED DEVELOPMENT WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA. -- REQUIRED PRIOR TO PERMIT ISSUANCE
11/7/2024 Zoning Review - Reviewed NEEDED: * ENVIRONMENTAL HEALTH SIGNED SITE PLAN *ADDRESS CONFIRMATION-- MG WORKING ON ZONING: *MFE= 1' ABOVE THE ROAD
11/8/2024 Final Review - Documents Required NEEDED: *THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA. - PRIOR TO ISSUANCE
11/14/2024 Zoning Review - Reviewed
11/25/2024 Final Review - Payment Needed
11/25/2024 Permit Issued Permit # created and approved from payment.
Contractors
Name/ Business License Title Role
Rusty L Knowles
Floridas Finest Mobile Home Set Up
IH1038219 Mh Installer (ih) Contractor
Glenn Whittington
Whittington Electric Inc
EC13002957 Electrical Contractor Subcontractor
Michael A Boland
Ace A/c Of Ocala Llc
CAC1817716 Cert Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 11/14/2024
Passed: Mobile Home - Mobile Home Set-Up Final Gary Pitzer 12/13/2024
Release to power company Gary Pitzer 12/13/2024
Passed: Engineering - Setbacks Gary Pitzer 12/13/2024