10/30/2024
|
Application pending.
|
10/30/2024
|
Application submitted by applicant.
|
10/30/2024
|
City of Lake City Utilities Notified.
City of Lake City Notified of Application within Utility Service Areas LC_WATER,.
|
10/31/2024
|
Point Review - Printed-Online Application
NEEDED
* RUSTY L KNOWLES UPDATED STATE LICENSE AND WORKERS COMP
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
|
11/7/2024
|
Zoning Review - Reviewed
NEEDED:
***PLEASE REFRAIN FROM UPLOADING DOCUMENTS THAT CONTAIN SENSITIVE INFORMATION SUCH AS SOCIAL SECURITY NUMBERS, ETC... DOCUMENTS ARE PUBLIC RECORD
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
|
11/7/2024
|
Plan Review - Reviewed
NEEDED:
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
*ADDRESS CONFIRMATION-- MG WORKING ON
***THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION OF THE PROPOSED STRUCTURES LOWEST BEAM. AN ENGINEER LETTER WILL BE REQUIRED TO ASSURE THAT THE PROPOSED DEVELOPMENT WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA. -- REQUIRED PRIOR TO PERMIT ISSUANCE
|
11/7/2024
|
Zoning Review - Reviewed
NEEDED:
* ENVIRONMENTAL HEALTH SIGNED SITE PLAN
*ADDRESS CONFIRMATION-- MG WORKING ON
ZONING: *MFE= 1' ABOVE THE ROAD
|
11/8/2024
|
Final Review - Documents Required
NEEDED:
*THERE IS A SIGNIFICANT DIFFERENCE IN THE ELEVATION OF THE ROAD AND THE ELEVATION AT THE PROPOSED DEVELOPMENT. AN ENGINEER LETTER WILL BE REQUIRED TO ASURE THAT THE MINIMUM FLOOR ELEVATION WILL BE SUFFICIANT TO AVOID POSSIBLE RISING WATERS OF THE AREA. - PRIOR TO ISSUANCE
|
11/14/2024
|
Zoning Review - Reviewed
|
11/25/2024
|
Final Review - Payment Needed
|
11/25/2024
|
Permit Issued
Permit # created and approved from payment.
|