| Inspection |
Notes |
Performed By |
Date |
| Passed: Electrical - 1st Underground Rough–In |
Under Slab |
Gary Pitzer |
12/17/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Water Pressurized, Dwv With Cleanout |
Gary Pitzer |
12/17/2024 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
12/19/2024 |
| Passed: Building - Monolithic Slab |
2 Main Slab |
Gary Pitzer |
12/19/2024 |
| Passed: Building - Monolithic Slab |
|
Gary Pitzer |
1/3/2025 |
| Passed: Engineering - Setbacks |
|
Gary Pitzer |
1/3/2025 |
| Passed: Building - Framing |
Metal Framing For Shell Only |
Gary Pitzer |
2/12/2025 |
| Passed: Electrical - Temporary Service |
Temp Electric Only, One Outlet Only On Exterior |
Gary Pitzer |
2/20/2025 |
| Release to power company |
|
Gary Pitzer |
2/20/2025 |
| Septic Release Inspection |
|
Health Dept |
3/3/2025 |
| Failed: Building - Framing |
Need Draft Stopping Around Perimeter Of Walls |
Gary Pitzer |
6/10/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
6/10/2025 |
| Failed: Mechanical - Rough In |
All Boxes Need Pads |
Gary Pitzer |
6/10/2025 |
| Failed: Electrical - 2nd Rough-In |
1, Need Underground Cable In Kitchen And Out Of J Box To Camper Plug, 2. Cover Underground Feeder Cable With Some Type Of Conduit Under Sub Panel, 3. Secure Nonmetallic Wiring In Several Location In Walls, 4. Terminate All Wire In Boxes And Have Made Ready For Devices |
Gary Pitzer |
6/10/2025 |
| Passed: Mechanical - Rough In |
|
Gary Pitzer |
7/2/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Gary Pitzer |
7/2/2025 |
| Passed: Building - Framing |
|
Gary Pitzer |
7/2/2025 |
| Passed: Electrical - Permanent Power |
Four Wire Was Added To Sub-panel To Clear Up Defect |
Gary Pitzer |
12/8/2025 |
| Release to power company |
|
Gary Pitzer |
12/10/2025 |