Permit Details

Permit Search

Permit

New Residential Construction

454 NW CASTLEWOOD CT
LAKE CITY, FL 32055

Permit #
000051577
Application #
67347
Status Completed
  1. Submitted Oct 15, 2024
  2. Issued Mar 19, 2025
  3. Expires Mar 7, 2026
  4. Completed Sep 8, 2025

Property

Parcel #
01777-110
Owner
Sullivan Edward Ray, Sullivan Tristin Le
Acres
5.05
Subdivision
Suwannee Valley Farms Phase 1
Zoning
A-3
Flood zone
X
District
1

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Subdivision Plat
Finished floor requirement
110'
Requirement needed
By Nailing Inspection
Document needed is
the Engineers letter confirming their requirements
Document receieved
Yes
Fema map number
12023C0186D
This is the construction of a
Single Family Dwelling
Setbacks Front
30'
Setback Side 1
25'
Setback Side 2
25'
Setbacks Rear
25'
Stories
1
Heated Area (Sqft)
2531
Total Area (Sqft)
3962
Building Height
21
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0652
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Plan Review - Corrections Needed
  5. Plan Review - Documents Required
  6. Plan Review - Plumbing Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Electrical Approved
  9. Plan Review - Building Approved
  10. Plan Review - Reviewed
  11. Zoning Review - Processing
  12. Zoning Review - Documents Required
  13. Zoning Review - Reviewed
  14. Final Review - Reviewed
  15. Final Review - Payment Needed
  16. Final Review - Payment Needed
  17. Final Review - Payment Needed
  18. Permit Issued
  19. Permit Reissued
  20. Final Review - Complete

Contractors

  • Bryan Zecher

    Bryan Zecher Homes Inc

    License
    CBC1257343
    Title
    Building Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Donald R Hollingsworth

    Holly Electric Inc

    License
    EC13005429
    Title
    Electrical
    Role
    Subcontractor
  • Anthony R Franks

    Lane Heating & Air Llc

    License
    CAC1818631
    Title
    Cert. A/c Class “b”
    Role
    Subcontractor

    County License & State License Expired.

  • Benjamin T Keeler

    Keeler Roofing, Llc

    License
    CCC1330509
    Title
    Cert. Roofing
    Role
    Subcontractor

Inspections

  1. Nov 26, 2024

    Passed: Building - Footer

    Inspected by Troy Crews

  2. Nov 26, 2024

    Passed: Engineering - Setbacks

    Inspected by Troy Crews

  3. Dec 11, 2024

    Passed: Electrical - Temporary Service

    Inspected by Troy Crews

  4. Dec 11, 2024

    Release to power company

    Inspected by Troy Crews

  5. Jan 21, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Troy Crews

  6. Feb 10, 2025

    Passed: Building - Slab

    Inspected by Troy Crews

  7. Mar 25, 2025

    Passed: Building - Roof Decking

    Inspected by Troy Crews

  8. Mar 25, 2025

    Passed: Building - Wall Sheathing

    Inspected by Troy Crews

  9. Apr 21, 2025

    Passed: Building - Framing

    Inspected by Troy Crews

  10. Apr 28, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Troy Crews

  11. Apr 28, 2025

    Passed: Mechanical - Rough In

    Inspected by Troy Crews

  12. Apr 28, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    No Test On Gas Piping This Should Be Done By Gas Supplier On Final Startup

    Inspected by Troy Crews

  13. Apr 28, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Inspected by Troy Crews

  14. May 5, 2025

    Passed: Building - Insulation

    Inspected by Troy Crews

  15. Jun 25, 2025

    Failed: Electrical - Permanent Power

    Finish Grade Needs To Be Adjusted Near Meter Can Maximum Height Is 6 Foot 6 Inches To Main Breakers Also Need Final Driveway

    Inspected by Troy Crews

  16. Jul 14, 2025

    Passed: Electrical - Permanent Power

    Septic Final Rec'd 7.15.25 - Mg

    Inspected by Troy Crews

  17. Jul 15, 2025

    Release to power company

    Inspected by Mgarber

  18. Jul 16, 2025

    Septic Release Inspection

    Inspected by Health Dept

  19. Sep 8, 2025

    Passed: Building - Final

    Inspector Verified Vent-- 9.8.25 Mg

    Inspected by Anthony Aslan

Documents