Inspection |
Notes |
Performed By |
Date |
Passed: Building - Footer |
Check For Washouts After The Rain |
Matt Forsyth |
12/11/2024 |
Passed: Engineering - Setbacks |
|
Matt Forsyth |
12/11/2024 |
Passed: Electrical - 1st Underground Rough–In |
Under Slab Chase |
Gary Pitzer |
12/26/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
Dwv Under Slab, No Water. Please Post Readable Address To Property At Brown Rd |
Gary Pitzer |
12/26/2024 |
Passed: Building - Slab |
Plastic Taped, Steel Around Perimeter ,ground Wire Off Footer Steel |
Gary Pitzer |
1/2/2025 |
Passed: Building - Roof Decking |
Front Porch Decking Will Be Looked At Framing Inspection |
Matt Forsyth |
2/11/2025 |
Passed: Building - Wall Sheathing |
|
Matt Forsyth |
2/11/2025 |
Septic Release Inspection |
|
Health Dept |
2/20/2025 |
Failed: Re-Roof - Final |
Roof Is Not Complete Please Send Pictures Of Completion In Before Rescheduling |
Matt Forsyth |
3/13/2025 |
Passed: Electrical - 2nd Rough-In |
|
Matt Forsyth |
3/28/2025 |
Passed: Mechanical - Rough In |
Attic Design For Air Handler |
Matt Forsyth |
3/28/2025 |
Passed: Plumbing/Gas - 2nd Rough-In |
Fireplace Gas |
Matt Forsyth |
3/28/2025 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Matt Forsyth |
3/28/2025 |
Rescheduled 3/31/2025:Building - Framing |
|
Matt Forsyth |
3/28/2025 |
Passed: Building - Framing |
Collar Ties Will Need Engineering |
Matt Forsyth |
3/31/2025 |
Passed: Building - Insulation |
|
Matt Forsyth |
4/14/2025 |
Passed: Electrical - Permanent Power |
|
Matt Forsyth |
8/25/2025 |
Release to power company |
Ok To Release Power-- 8.25.25 Mg |
Matt Forsyth |
8/25/2025 |
Submitted Power Release through FPL Portal |
|
Garber, Melissa |
8/25/2025 |
Passed: Building - Final |
Blower Door Test Reviewed Fresh Air Confirmed |
Matt Forsyth |
8/29/2025 |