Permit Details

Permit Search

Permit

Storage Building

247 SE PUEBLO WAY
LAKE CITY, FL 32025

Permit #
000051515
Application #
66991
Status Completed
  1. Submitted Sep 16, 2024
  2. Issued Nov 14, 2024
  3. Expires Aug 19, 2025
  4. Completed Feb 20, 2025

Property

Parcel #
08300-089
Owner
Asbel Eugene D,
Acres
0.40
Subdivision
Woodhaven Unit Iv
Zoning
RSF-2
Flood zone
AH
District
5

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Accessory Use
Finished floor requirement
Non-Habitable Structure
Requirement needed
By Final Inspection
Document needed is
an Elevation Certificate for Finished Construction
Document receieved
Yes
Fema map number
12023C0313D
Water source
Sante Fe
In floodway
N
Type of Structure
Other
Commercial or Residential?
Residential
Total Area (Sqft)
875
Septic# (00-0000) or (X00-000)
24-0709
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setback Rear
10' (accessory)
Building Code Construction Type
III
Building Code Element
B
Building Code Occupancy Types
Storage
Occupancy Use Title
non habitable structure
Dev Permit #
F024-014
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Building Height
10'
Building Length
35
Building Width
25
Service Amps
0
Slab
New
Mechanical
No
Electrical
No
Plumbing
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Point Review - Printed-Online Application
  5. Point Review - Reviewed
  6. Zoning Review - Documents Required
  7. Zoning Review - Documents Required
  8. Zoning Review - Documents Required
  9. Zoning Review - Reviewed
  10. Plan Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued

Contractors

  • Donald E Little

    Tubular Building Systems Llc

    License
    CBC1262211
    Title
    Cert. Building
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Oct 7, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Dec 6, 2024

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  3. Dec 6, 2024

    Passed: Building - Footer

    Inspected by Gary Pitzer

  4. Feb 20, 2025

    Passed: Building - Final

    Inspected by Gary Pitzer

Documents