Permit Details

Permit Search

Permit

Solar Power System

1300 SW CUMORAH HILL ST
FORT WHITE, FL 32038

Permit #
000051514
Application #
67802
Status Completed
  1. Submitted Oct 28, 2024
  2. Issued Nov 14, 2024
  3. Expires Nov 4, 2025
  4. Completed May 8, 2025

Property

Parcel #
03934-004
Owner
Fries Billy L, Fries Anjanette L
Acres
4.80
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0485C
PV Type
Utility Interactive PV System- (DC to AC with utility connection)
Grounding
N.E.C. Chapter 690
AC Options
UF
AC Options (Cont..)
In Conduit;THWN-2
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Power Company
Clay Electric
Residential or Commercial?
Residential
Where are the panels mounted?
Ground Mounted
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Reviewed
  6. Final Review - Processing
  7. Final Review - Reviewed
  8. Final Review - Payment Needed
  9. Permit Issued
  10. Plan Review - Reviewed
  11. Final Review - Payment Needed

Contractors

  • Norman Purkey

    Solar Bear Llc

    License
    EC13006630
    Title
    Cert. Electrical
    Role
    Contractor

    County License & State License Expired.

Inspections

  1. Feb 28, 2025

    Cancelled: Building - Footer

    Inspected by Troy Crews

  2. Feb 28, 2025

    Cancelled: Engineering - Setbacks

    Inspected by Troy Crews

  3. Feb 28, 2025

    Cancelled: Solar - Thermal Plumbing Final

    Inspected by Troy Crews

  4. Mar 4, 2025

    Failed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  5. Mar 4, 2025

    Failed: Solar - Solar Final

    1, Bonding Screw In First Means Of Disconnect At A Separately Derived System, 2. Sealing Devices On All Conduits Subject To Getting Water Into Equipment, 3. Post Near Heavy Batteries Are Very Unstable And Wood Support In Batteries Appear To Be Already Split From Drying Out And Screws Being Installed With Pre-drilling, Owner Is Not Very Happy With Your End Product

    Inspected by Gary Pitzer

  6. Apr 15, 2025

    Cancelled: Engineering - Setbacks

    Inspected by Emaleigh Williams

  7. Apr 16, 2025

    Failed: Electrical - Permanent Power

    Owner Still Unhappy With His Final Product. 1. Since The Last Inspection The Plywood That Was Installed To Hold Equipment Has Stated To Pull Lose From Supports, 2. All Conduits Subject To Letting Water Into Equipment Need Weather Seals, 3. A Bonding Device Is Required On The Means Of Disconnect For Separately Derived System, 3. The Electric Panel On The Bottom Needs To Be Raised To A Minimum Of 24 Inches Above Finish Grade

    Inspected by Gary Pitzer

  8. Apr 16, 2025

    Failed: Building - Footer

    Post Still Need To Be Stable Enough To Hold The Load

    Inspected by Gary Pitzer

  9. Apr 16, 2025

    Failed: Solar - Solar Final

    Inspected by Gary Pitzer

  10. Apr 16, 2025

    Failed: Solar - Thermal Plumbing Final

    Inspected by Gary Pitzer

  11. May 8, 2025

    Passed: Engineering - Setbacks

    Inspected by Gary Pitzer

  12. May 8, 2025

    Passed: Building - Footer

    Inspected by Gary Pitzer

  13. May 8, 2025

    Cancelled: Solar - Thermal Plumbing Final

    Inspected by Gary Pitzer

  14. May 8, 2025

    Passed: Electrical - Permanent Power

    Inspected by Gary Pitzer

  15. May 8, 2025

    Passed: Solar - Solar Final

    Inspected by Gary Pitzer