Roof Replacement or Repair
Permit
| Application #: | 68003 |
| Permit #: |
000051456 |
| Related Permit: |
|
| Submitted: | Friday, November 8, 2024 |
| Issued: | Friday, November 8, 2024 |
| Expires: | Friday, November 22, 2024 |
| Completed: | Friday, November 22, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0380C |
| Type Roofing Job |
Replacement - Tear off Existing and Replace |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Replace any rotten wood as needed |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
37 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
Yes |
| Type of New Roofing Product |
Asphalt Shingles |
| Florida Product Approval Number |
FL10674-R19 |
| Other Roofing Product Type Not Listed |
Rhino Roof Underlayment FL15216-R13 |
| Product Manufacturer |
Owens Corning |
| Product Description |
Tru Def. Duration |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified. |
| Ventilation: |
Ridge Vent |
| Flashing: |
Repair Existing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 11/7/2024 |
Application pending. |
| 11/8/2024 |
Application submitted by applicant. |
| 11/8/2024 |
Final Review - Payment Needed |
| 11/8/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Clark R Briggs Jr Kayco Roofing Llc
|
CCC1328803 |
Cert. Roofing |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
|
Matt Forsyth |
11/13/2024 |
| Passed: Re-Roof - Final |
|
Matt Forsyth |
11/22/2024 |