Permit Details

Permit Search

Permit

Roof Replacement or Repair

123 SW SONOMA WAY
FORT WHITE, FL 32038

Permit #
000051455
Application #
67872
Status Completed
  1. Submitted Nov 4, 2024
  2. Issued Nov 8, 2024
  3. Expires May 20, 2025
  4. Completed Nov 21, 2024

Property

Parcel #
04066-032
Owner
Staab Robert Eric,
Acres
1.96
Subdivision
Quail Ridge
Zoning
A-3
Flood zone
X
District
2

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0495C
Type Roofing Job
Re-Cover - New Material over Existing
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
Roof has metal over 3 tab shingles customer wants to replace metal only going to remove metal, install purins and new ultrarib metal roofing.
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1650
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
Yes
Type of New Roofing Product
Metal
Florida Product Approval Number
36904.2
Product Manufacturer
Tri-county metals
Product Description
29 gauge ultrarib
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
Other (explain)
Sealed roof decking explanation for other option.
removing and replacing metal with new metal over exist shingle roof but adding purlins
Ventilation:
Ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
Yes

Status & Review History

  1. Application pending.
  2. Final Review - Corrections Needed
  3. Final Review - Payment Needed
  4. Permit Issued

Contractors

  • Waylon R Mitchell

    Waylons Watertight Roofing

    License
    CCC1332687
    Title
    Cert. Roofing
    Role
    Contractor

    County License & State License & Liability Insurance & Workers Comp Expired.

Inspections

  1. Nov 19, 2024

    Passed: Re-Roof - In Progress

    Purlins Installed

    Inspected by Anthony Aslan

  2. Nov 21, 2024

    Passed: Re-Roof - Final

    Inspected by Anthony Aslan