Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 681 SW JOE MARKHAM DR
LAKE CITY, FL 32024
Parcel #: 00469-107
Acres: 13.57
Owner: Ryan Jonathon Ralph, Ryan Sandra Lynn
Subdivision: Shirley Gorospe Tract (division Of Land)
Zoning: ESA-2
Flood Zone: X
District: 2
Application #: 67167
Permit #: 000051430
Related Permit:
Submitted: Tuesday, October 1, 2024
Issued: Thursday, November 7, 2024
Expires: Tuesday, July 15, 2025
Completed: Tuesday, July 15, 2025
Status: Completed
Septic Release? Yes
Notes:
SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
Job Details
Elevation regulation Minimum Requirement
Finished floor requirement Finished Floor Requirement One foot above the road
Fema map number 12023C0370C
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 1706
Total Area (Sqft) 2394
Building Height 23
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0168
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Service Amps 400
Review Notes
9/23/2024 Application pending.
10/1/2024 Application submitted by applicant.
10/3/2024 Point Review - Printed-Online Application NEEDED: *APPLICANT MUST BE CONTRACTOR OR AUTHORIZED AGENT, NOT PROPERTY OWNER *MECHANICAL & PLUMBING SIGNED SUBCONTRACTOR FORM *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *SEALED STRUCTURAL PLANS ***PRIOR TO INSPECTIONS*** RECORDED NOC
10/3/2024 Point Review - Reviewed NEEDED: *APPLICANT MUST BE CONTRACTOR OR AUTHORIZED AGENT, NOT PROPERTY OWNER *MECHANICAL & PLUMBING SIGNED SUBCONTRACTOR FORM *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *SEALED STRUCTURAL PLANS ***PRIOR TO INSPECTIONS*** RECORDED NOC
10/4/2024 Zoning Review - Reviewed NEEDED: *APPLICANT MUST BE CONTRACTOR OR AUTHORIZED AGENT, NOT PROPERTY OWNER *MECHANICAL & PLUMBING SIGNED SUBCONTRACTOR FORM *ENV HEALTH SIGNED SITE PLAN APPROVAL-- CONTACT 386-758-1058 *SEALED STRUCTURAL PLANS ***PRIOR TO INSPECTIONS*** RECORDED NOC ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
10/8/2024 Plan Review - Corrections Needed NEEDED: **CHECK LIST SQFT MISMATCHED ENERGY FORM AND MANUAL J *APPLICANT MUST BE CONTRACTOR OR AUTHORIZED AGENT, NOT PROPERTY OWNER *MECHANICAL & PLUMBING SIGNED SUBCONTRACTOR FORM *SEALED STRUCTURAL PLANS ***PRIOR TO INSPECTIONS*** RECORDED NOC ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
10/8/2024 Plan Review - Documents Required NEEDED: **CHECK LIST SQFT MISMATCHED ENERGY FORM AND MANUAL J *APPLICANT MUST BE CONTRACTOR OR AUTHORIZED AGENT, NOT PROPERTY OWNER *MECHANICAL & PLUMBING SIGNED SUBCONTRACTOR FORM *SEALED STRUCTURAL PLANS ***PRIOR TO INSPECTIONS*** RECORDED NOC ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
10/14/2024 Plan Review - Documents Required NEEDED: *APPLICANT MUST BE CONTRACTOR OR AUTHORIZED AGENT, NOT PROPERTY OWNER *MECHANICAL & PLUMBING SIGNED SUBCONTRACTOR FORM *SEALED STRUCTURAL PLANS ***PRIOR TO INSPECTIONS*** RECORDED NOC ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
10/21/2024 Plan Review - On Hold-Incomplete NEEDED: *SEALED STRUCTURAL PLANS * JAMES BUTLER JR UPDATED STATE LICENSE BLDGINFO@COLUMBIACOUNTYFLA.COM * AUTHORIZATION FOR TOM JENKINS TO SIGN ON SUB FORM PLEASE EMAIL TO BLDGINFO@COLUMBIACOUNTYFLA.COM ***PRIOR TO INSPECTIONS*** RECORDED NOC ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
10/28/2024 Plan Review - On Hold-Incomplete NEEDED: *SEALED STRUCTURAL PLANS - UPLOADED ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
11/1/2024 Plan Review - Building Approved ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/1/2024 Plan Review - Electrical Approved ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/1/2024 Plan Review - Mechanical Approved ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/1/2024 Plan Review - Plumbing Approved ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/1/2024 Plan Review - Fuel/Gas Approved ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/1/2024 Plan Review - Reviewed ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/4/2024 Final Review - Documents Required ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD. * FLOODPLAIN ORDINANCE NOTICE TO OWNER - THIS FORM CAN BE FOUND ON THE WEBSITE UNDER THE DOCUMENTS TAB
11/7/2024 Final Review - Reviewed ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
11/7/2024 Final Review - Payment Needed ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
11/7/2024 Permit Issued Permit #000051430 created and approved.
7/9/2025 Final Review - Complete ***PRIOR TO INSPECTIONS*** ZONING: SITE BUILT STRUCTURE: *MFE= 1' ABOVE THE ROAD.
Contractors
Name/ Business License Title Role
David J Waters
Coolwaters Homes & Renovation Llc
CBC1261222 Cert. Building Contractor
James Butler Jr
Butler Plumbing Of Gainesville Inc
CFC057960 Plumbing Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Clyde Morgan
Tom Jenkins Electrical Service Inc
EC13001161 Electrical Contractor Subcontractor
Inspections
Inspection Notes Performed By Date
Failed: Building - Footer Need Picture Of Permit Box Including Notice Of Commencement And Permit Also Picture Of A Portalette On Site Matt Forsyth 11/8/2024
Passed: Engineering - Setbacks Matt Forsyth 11/8/2024
Passed: Building - Footer Matt Forsyth 12/16/2024
Cancelled: Engineering - Setbacks Matt Forsyth 12/16/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 12/16/2024
Passed: Building - Slab Anthony Aslan 12/27/2024
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 1/29/2025
Passed: Building - Roof Decking Matt Forsyth 1/29/2025
Passed: Building - Strapping Matt Forsyth 1/29/2025
Passed: Building - Wall Sheathing Matt Forsyth 1/29/2025
Passed: Building - Framing Partial Framing To Finish The Envelope We Need Windows And Doors Complete Please Schedule On Next Inspection Out Matt Forsyth 1/29/2025
Passed: Electrical - 2nd Rough-In Need Nail Plates At Service Entrance Conductors Top Plate We'll Check On Insulation Inspection Matt Forsyth 3/3/2025
Passed: Mechanical - Rough In Drain For Unit Upstairs Matt Forsyth 3/3/2025
Passed: Plumbing/Gas - 2nd Rough-In Air Admittance Valves Under Sinks Matt Forsyth 3/3/2025
Passed: Building - Insulation Request Picture Installation Baffles Matt Forsyth 3/11/2025
Passed: Electrical - Permanent Power Home Is Complete Did A Final Inspection Walk Around Also Matt Forsyth 7/10/2025
Release to power company Matt Forsyth 7/10/2025
Passed: Building - Final Septic Final Required Prior To Release Of Co-- 7.14.25 Mg Matt Forsyth 7/11/2025
Septic Release Inspection Health Dept 7/16/2025
Documents
File Name Date File Size