| Finished floor requirement |
|
| Fema map number |
12023C0382D |
| Type Roofing Job |
Re-Cover - New Material over Existing |
| Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Damaged decking wood to be replaced |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
1500 |
| No. of Stories |
1 |
| Roof Pitch |
2:12 to 4:12 |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
Metal over existing 1 layer of shingles |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
FL28363.1 |
| Product Manufacturer |
Deep Sotuh Metals |
| Product Description |
South Rib 3 Coverage 26g |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
Metal over existing shingles |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace with L-Flashing |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |