- Finished floor requirement
-
- Fema map number
- 12023C0290D
- Type Roofing Job
- Partial Roof Repairs
- Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
- Remove existing shingles, eve drip and underlayment on two East facing roof facets (approx. 14 squares w/o waste).Remove and replace damaged wood decking and fascia boards.Install (where removed) new GAF FeltBuster synthetic underlayment (x2), StormGuard Ice/Water Shield on bottom eves, FHA eve drip & ridge cap.Install new aluminum soffit & fascia on damaged rake and bottom eve.
- Type of structure
- House
- Commercial or Residential
- Residential
- Roof Area (for this job) Sq Ft
- 140
- No. of Stories
- 1
- Roof Pitch
- 2:12 to 4:12
- Is the existing roof being removed?
- Yes
- Type of New Roofing Product
- Asphalt Shingles
- Florida Product Approval Number
- FL10124-R25
- Product Manufacturer
- GAF
- Product Description
- Shingle
- Building Code Edition
- 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
- Sealed roof decking options: (Must select an option.)
- Other (explain)
- Sealed roof decking explanation for other option.
- Remove existing shingles, eve drip and underlayment on two East facing roof facets (approx. 14 squares w/o waste).
- Ventilation:
- Ridge Vent
- Flashing:
- Replace All
- Drip Edge:
- Replace All
- Valley Treatment:
- New Mineral Surface