Finished floor requirement |
|
Fema map number |
12023C0311D |
Type Roofing Job |
Partial Roof Repairs |
Further Job Details (Explain if decking is being replaced and or Repairs are being done.) |
Remove approx. 6 damaged metal roof panels, 2 rake trim and 2 transition flashing.
Remove underlying purlins, shingles, underlayment and damaged plywood.
Repair damaged trusses and install new decking, underlayment and purlins.
Install 6 new 29 gauge Dark Gray painted metal roof panels, 2 rake trim, 2 transition flashing and 1 zipper boot w/new 2” ZAC screws. |
Type of structure |
House |
Commercial or Residential |
Residential |
Roof Area (for this job) Sq Ft |
200 |
No. of Stories |
1 |
Roof Pitch |
2:12 to 4:12 |
Type of New Roofing Product |
Metal |
Florida Product Approval Number |
36904.2 |
Other Roofing Product Type Not Listed |
Metal |
Product Manufacturer |
Tri County Metal |
Product Description |
Metal |
Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
Sealed roof decking options: (Must select an option.) |
Other (explain) |
Sealed roof decking explanation for other option. |
Remove approx. 6 damaged metal roof panels, 2 rake trim and 2 transition flashing.
2. Remove underlying purlins, shingles, underlayment and damaged plywood.
3. Repair damaged trusses and install new decking, underlayment and purlins.
4. Install 6 new 29 gauge Dark Gray painted metal roof panels, 2 rake trim, 2 transition flashing and 1 zipper boot w/new 2” ZAC screws. |
Ventilation: |
Ridge Vent |
Flashing: |
Replace All |
Drip Edge: |
Replace All |
Valley Treatment: |
New Metal |