Failed: Engineering - Final Driveway
Minimum 4" Compacted Limerock Not Installed. Steps Should Be Taken To Ensure Runoff Does Not Travel Down Driveway. Please See Note 2 And Note 7 With Provided Pdf (300-3_unpavednoculvert) For Details.
Inspected by Beach, Garrett