Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 220 SW BEDENBAUGH LN
LAKE CITY, FL 32025
Parcel #: 08944-032
Acres: 3.15
Owner: Parsons Stephen M, Parsons Mary D
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 67413
Permit #: 000051308
Related Permit: Right-of-Way Access/Driveway: 000051303
Submitted: Tuesday, October 8, 2024
Issued: Tuesday, October 29, 2024
Expires: Tuesday, April 22, 2025
Completed: Tuesday, April 22, 2025
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0401C
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 2169
Total Area (Sqft) 3533
Building Height 23
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0771
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 200
Review Notes
10/8/2024 Application pending.
10/8/2024 Application submitted by applicant.
10/14/2024 Point Review - Printed-Online Application
10/24/2024 Plan Review - Building Approved
10/24/2024 Plan Review - Electrical Approved
10/24/2024 Plan Review - Mechanical Approved
10/24/2024 Plan Review - Plumbing Approved
10/24/2024 Plan Review - Fuel/Gas Approved
10/24/2024 Plan Review - Reviewed
10/24/2024 Zoning Review - Status Cleared
10/24/2024 Zoning Review - Reviewed
10/28/2024 Final Review - Processing
10/28/2024 Final Review - Processing
10/29/2024 Final Review - Payment Needed
10/29/2024 Permit Issued
Contractors
Name/ Business License Title Role
Kevin L Bedenbaugh Jr
Plumb Level Construction Co Llc
CGC1516042 General Contractor Contractor
Cody Barrs
Barrs Plumbing Inc
CFC1427145 Plumbing Contractor Subcontractor
Kevin L Bedenbaugh Jr
Plumb Level Construction Co Llc
CCC1329482 Roofing Contractor Subcontractor
Ryan Felknor
Felknor Electric, Inc.
EC13003153 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Anthony Aslan 10/31/2024
Passed: Engineering - Setbacks Anthony Aslan 10/31/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 11/19/2024
Rescheduled 12/4/2024:Building - Slab Troy Crews 12/4/2024
Passed: Building - Slab #5 Perimeter Bar Porches Recommended Matt Forsyth 12/4/2024
Passed: Electrical - Temporary Service Existing Power Pole With Gfci Below Gary Pitzer 12/12/2024
Release to power company Gary Pitzer 12/12/2024
Passed: Building - Wall Sheathing Matt Forsyth 12/31/2024
Passed: Building - Roof Decking Matt Forsyth 1/7/2025
Passed: Building - Framing Matt Forsyth 1/21/2025
Passed: Electrical - 2nd Rough-In Pigtails Hanging Out Of Boxes Matt Forsyth 1/21/2025
Passed: Mechanical - Rough In Matt Forsyth 1/21/2025
Passed: Plumbing/Gas - 2nd Rough-In Tub Water Tested Matt Forsyth 1/21/2025
Passed: Building - Insulation Spray Foam Insulation Matt Forsyth 1/27/2025
Rescheduled 3/24/2025:Electrical - Permanent Power Troy Crews 3/24/2025
Passed: Electrical - Permanent Power Septic Matt Forsyth 3/24/2025
Release to power company Melissa Garber 3/28/2025
Septic Release Inspection Health Dept 3/28/2025
Passed: Building - Final Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. Matt Forsyth 4/17/2025
Certificate-Release Certificate Matt Forsyth 4/22/2025