Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit

Address 132 NE CORENE DR
LAKE CITY, FL 32055
Parcel #: 04956-001
Acres: 0.73
Owner: Berry Rusty L, Berry Tami D
Subdivision:
Zoning: RSF/MH-2
Flood Zone: X
District: 1
Application #: 64648
Permit #: 000051260
Related Permit: Right-of-Way Access/Driveway: 000049991
Submitted: Friday, March 22, 2024
Issued: Friday, October 25, 2024
Expires: Friday, December 6, 2024
Completed: Friday, December 6, 2024
Status: Completed
Septic Release? Yes
Notes:
*MFE= 1' ABOVE THE ROAD
Job Details
Finished floor requirement
Fema map number 12023C0260C
Type Roofing Job Replacement - Tear off Existing and Replace
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 26
No. of Stories 1
Roof Pitch 4:12 or Greater
Is the existing roof being removed? Yes
Type of New Roofing Product Asphalt Shingles
Florida Product Approval Number 10124.1
Other Roofing Product Type Not Listed GARDNER ASPHALT, APOC UNDERLAYMENT, # 21652.1
Product Manufacturer GAF
Product Description ASPHALT ROOF SHINGLES
Building Code Edition 2020 Florida Building Code 7th Edition and Florida Statute 553.844
Sealed roof decking options: (Must select an option.) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Ventilation: Ridge Vent
Flashing: Replace All
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
3/28/2024 Point Review - Reviewed
3/28/2024 Plan Review - Reviewed
4/1/2024 Zoning Review - Contact the Building Dept
4/18/2024 Plan Review - Reviewed
4/18/2024 Zoning Review - Reviewed
4/18/2024 Final Review - Corrections Needed
5/21/2024 Final Review - Contact the Building Dept
5/23/2024 Final Review - Contact the Building Dept
5/28/2024 Final Review - Contact the Building Dept
6/5/2024 Final Review - Contact the Building Dept
6/10/2024 Final Review - Contact the Building Dept
6/17/2024 Final Review - Contact the Building Dept
6/18/2024 Final Review - Corrections Needed
6/25/2024 Final Review - Corrections Needed
7/2/2024 Final Review - Corrections Needed
7/9/2024 Final Review - Corrections Needed
7/29/2024 Final Review - Corrections Needed
8/19/2024 Final Review - Corrections Needed
8/27/2024 Final Review - Corrections Needed
9/3/2024 Final Review - Corrections Needed
9/11/2024 Final Review - Corrections Needed
9/11/2024 Final Review - Corrections Needed
9/24/2024 Final Review - Corrections Needed
10/16/2024 Final Review - Contact the Building Dept
10/21/2024 Final Review - Corrections Needed
10/24/2024 Final Review - Payment Needed
10/25/2024 Permit Issued
Contractors
Name/ Business License Title Role
Robert D Sheppard
Melvins Mobile Home Service
IH1025386 Mh Installer (ih) Contractor
Everton D Ruddock
D&s Lighting Inc
EC13003800 Electrical Contractor Subcontractor
Clinton G Wilson
Wilson Heat & Air Inc
CAC057886 Class B A/c Subcontractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 5/21/2024
Passed: Engineering - Setbacks Appears To With In Set Backs Gary Pitzer 10/28/2024
Failed: Mobile Home - Mobile Home Set-Up Final 1. Need Ac Unit Wired, 2. Need Anti Siphon Device On Exterior Water Gary Pitzer 10/28/2024
Passed: Mobile Home - Mobile Home Set-Up Final Gary Pitzer 12/6/2024
Release to power company Gary Pitzer 12/6/2024
Passed: Engineering - Setbacks Gary Pitzer 12/6/2024
Documents
File Name Date File Size