Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Setbacks |
|
Gary Pitzer |
10/30/2024 |
Passed: Building - Footer |
|
Gary Pitzer |
10/30/2024 |
Passed: Electrical - 1st Underground Rough–In |
Grounding Electrode Conductor To Footer Steel |
Gary Pitzer |
10/30/2024 |
Passed: Electrical - Temporary Service |
|
Gary Pitzer |
11/6/2024 |
Release to power company |
|
Gary Pitzer |
11/6/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Gary Pitzer |
11/13/2024 |
Passed: Electrical - 1st Underground Rough–In |
|
Gary Pitzer |
11/13/2024 |
Passed: Building - Slab |
|
Gary Pitzer |
11/14/2024 |
Passed: Building - Lintel/Tie Beam |
Per Approved Plan |
Gary Pitzer |
12/2/2024 |
Passed: Building - Framing |
|
Gary Pitzer |
12/11/2024 |
Passed: Building - Roof Decking |
Few Shiners In Progress With Removal |
Gary Pitzer |
12/11/2024 |
Passed: Electrical - 1st Underground Rough–In |
This Is For The House Rough In Walls And Ceiling |
Gary Pitzer |
12/23/2024 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
12/23/2024 |
Cancelled: Electrical - 1st Underground Rough–In |
|
Gary Pitzer |
12/23/2024 |
Rescheduled 1/14/2025:Plumbing/Gas - 2nd Rough-In |
|
Gary Pitzer |
1/9/2025 |
Passed: Plumbing/Gas - 2nd Rough-In |
Walls And Ceilings Dwv, Water With Pressure, Tub And Showers To Be Flooded At Later Date Per Owner, Owner Going To Be Getting Engineer Letter For Brick Without Weep Holes |
Gary Pitzer |
1/14/2025 |
Rescheduled 1/24/2025:Plumbing/Gas - Tub Set/Shower Pan |
|
Troy Crews |
1/24/2025 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
|
Troy Crews |
1/24/2025 |
Passed: Electrical - Permanent Power |
Elevation Letter |
Gary Pitzer |
3/3/2025 |
Septic Release Inspection |
|
Health Dept |
3/10/2025 |
Release to power company |
|
Emaleigh Williams |
3/20/2025 |
Passed: Building - Final |
All Outlets And Sd Functional, Kitchen, Bath And Bedroom |
Gary Pitzer |
5/8/2025 |