Permit Details

Permit Search

Permit

Right-of-Way Access/Driveway

316 SW CYPRESSWOOD GLN LAKE CITY, FL 32025

Permit #
000051222
Application #
66752
Status Completed
  1. Submitted Aug 22, 2024
  2. Issued Oct 23, 2024
  3. Expires May 6, 2029
  4. Completed May 7, 2026

Property

Parcel #
09415-115
Owner
Curasco Perry Frank, Curasco Joann
Acres
5.00
Subdivision
—
Zoning
A-3
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
911 Address Application

Job Details

Finished floor requirement
Fema map number
12023C0415C
Standards
Culvert installation shall conform to the approved site plan standards
Requirements
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long
Status
Permanent
Type of connection for access road
Rural Driveway
Type of construction of property
Site Built Home
Normal vehicle usage:
Automobiles;Trucks
Side Drain required
Yes
Side Drain Size (diameter in inches)
18
Study Required
No
Estimated Number of Vehicle trips per day
3
Is the access for commercial or residential use?
Residential
County Road Type
Paved

Status & Review History

  1. Pending applicant completion and submission.
  2. Final Review - Corrections Needed
  3. Email confirmation reminder sent.
  4. Email confirmation reminder sent.
  5. Final Review - Corrections Needed
  6. Application submitted by applicant.
  7. Pending Public Works Application Approval
  8. Application Approved by Public Works
  9. Final Review - Payment Needed
  10. Pending initial driveway inspection
  11. Permit Issued
  12. New address issued and ticket completed.

Contractors

No contractors are listed on this permit.

Inspections

  1. Sep 19, 2024

    Passed: Engineering - ROW Access/Driveway connects to county maintained road

    Inspected by Chad Williams

  2. Oct 22, 2024

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  3. Apr 21, 2025

    Passed: Engineering - Driveway Spot Check

    Carport Shed Has Been Placed On Site

    Inspected by Smith, Blake

  4. Apr 21, 2026

    Passed: Engineering - Driveway Spot Check

    inspection Notes: Home Still Under Construction.

    Inspected by Beach, Garrett

  5. Apr 30, 2026

    Passed: Engineering - Initial Driveway

    Inspected by Smith, Blake

  6. May 7, 2026

    Passed: Engineering - Final Driveway

    Inspected by Beach, Garrett