Right-of-Way Access/Driveway
Permit
| Address |
, |
| Parcel #: |
04804-112 |
| Acres: | 17.82 |
| Owner: | Lunsford Donald Lee Iii, Lunsford Haley Diane |
| Subdivision: | |
| Zoning: | A-3 |
| Flood Zone: | X |
| District: | 1 |
| Application #: | 67164 |
| Permit #: |
000051202 |
| Related Permit: |
|
| Submitted: | Sunday, September 22, 2024 |
| Issued: | Tuesday, October 22, 2024 |
| Expires: | Wednesday, December 10, 2025 |
| Completed: | Wednesday, December 10, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0195D |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 24 feet straight ends with minimum 4 inches Limerock for cover |
| Status |
Permanent |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Site Built Home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
2 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Unpaved |
Review Notes
| 9/22/2024 |
Application submitted by applicant. |
| 9/22/2024 |
Pending Public Works Application Approval |
| 10/2/2024 |
Application Approved by Public Works |
| 10/21/2024 |
Final Review - Payment Needed |
| 10/21/2024 |
Pending initial driveway inspection |
| 10/22/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
9/22/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
10/22/2024 |
| Passed: Engineering - Driveway Spot Check |
Nothing Changed |
Smith, Blake |
4/21/2025 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
12/10/2025 |