Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Right-of-Way Access/Driveway Permit

Address 3875 NW LAKE JEFFERY RD
LAKE CITY, FL 32055
Parcel #: 02145-002
Acres: 3.52
Owner: Murray Leroy T, Murray Mae E
Subdivision:
Zoning: A-3
Flood Zone: X
District: 1
Application #: 67169
Permit #: 000051177
Related Permit: Mobile Home: 000051256
Submitted: Monday, September 23, 2024
Issued: Monday, October 21, 2024
Expires: Tuesday, December 3, 2024
Completed: Tuesday, December 3, 2024
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0291D
This is the construction of a SFD, UTILITY
Setbacks Front 25.00
Setback Side 1 10.00
Setback Side 2 10.00
Setbacks Rear 15.00
Stories 1
Heated Area (Sqft) 2998.00
Total Area (Sqft) 4556.00
Building Code Edition Florida Building Code 2014 5th Edition & 2011 National Electrical Code
Review Notes
9/23/2024 Application submitted by applicant.
9/23/2024 Pending Public Works Application Approval
10/2/2024 Application Approved by Public Works
10/18/2024 Final Review - Payment Needed
10/18/2024 Pending initial driveway inspection
10/21/2024 Permit Issued
Contractors
Name/ Business License Title Role
Melvin R Lopez
Advanced Electric & Security Llc
EC13005725 Cert. Electrical Subcontractor
Austin Lopez
Advanced Electric And Security Llc
CAC1820846 Cert. A/c Class “b” Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Engineering - ROW Access/Driveway connects to county maintained road Chad Williams 9/23/2024
Passed: Engineering - Initial Driveway Smith, Blake 10/21/2024
Passed: Engineering - Initial Driveway Beach, Garrett 12/3/2024
Passed: Engineering - Final Driveway Beach, Garrett 12/3/2024
Documents
File Name Date File Size
Certificate Of Occupancy.pdf 2020.04.14 169.15kB