Permit Details

Permit Search

Permit

New Residential Construction

451 SW LEGION DR
LAKE CITY, FL 32024

Permit #
000051133
Application #
67001
Status Completed
  1. Submitted Sep 24, 2024
  2. Issued Oct 17, 2024
  3. Expires Dec 14, 2026
  4. Completed Jun 18, 2026

Property

Parcel #
03026-004
Owner
C J Custom Carpentry Inc
Acres
1.79
Subdivision
—
Zoning
RR
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0290D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
1
Heated Area (Sqft)
2008
Total Area (Sqft)
2245
Building Height
22
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0714
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Processing
  4. Point Review - Printed-Online Application
  5. Zoning Review - Reviewed
  6. Plan Review - Corrections Needed
  7. Plan Review - Documents Required
  8. Plan Review - Documents Required
  9. Plan Review - Building Approved
  10. Plan Review - Electrical Approved
  11. Plan Review - Mechanical Approved
  12. Plan Review - Plumbing Approved
  13. Plan Review - Fuel/Gas Approved
  14. Plan Review - Reviewed
  15. Final Review - Reviewed
  16. Final Review - Payment Needed
  17. Permit Issued
  18. Submitted by building department on applicant's behalf

Contractors

  • Curtis K Jones

    Cj Custom Carpentry Inc

    License
    CGC1513223
    Title
    General Contractor
    Role
    Contractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Erik W Worthmann

    Comfort Temp Company Dba Ct Mechanical

    License
    CMC1249305
    Title
    Cert. Mechanical
    Role
    Subcontractor

    County License & State License Expired.

  • Matthew C Padgett

    Vintage Electric, Inc.

    License
    EC13007542
    Title
    Cert. Electrical
    Role
    Subcontractor

    County License & State License & Liability Insurance Expired.

Inspections

  1. Jan 13, 2025

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Inspected by Matt Forsyth

  2. Jan 21, 2025

    Passed: Electrical - 1st Underground Rough–In

    Island Rough

    Inspected by Matt Forsyth

  3. Jan 21, 2025

    Cancelled: Building - Slab

    Inspected by Matt Forsyth

  4. Jan 21, 2025

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  5. Jan 21, 2025

    Passed: Building - Monolithic Slab

    Inspected by Matt Forsyth

  6. Mar 14, 2025

    Failed: Building - Framing

    Not Complete

    Inspected by Matt Forsyth

  7. Mar 14, 2025

    Passed: Building - Ext Strapping/Wall Sheathing

    Inspected by Matt Forsyth

  8. Mar 14, 2025

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Mar 14, 2025

    Passed: Building - Strapping

    Inspected by Matt Forsyth

  10. Mar 14, 2025

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  11. Mar 18, 2025

    Passed: Building - Framing

    Only Thing Left In The Envelope Is The Garage Door And Front Door

    Inspected by Matt Forsyth

  12. Apr 22, 2025

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  13. Apr 22, 2025

    Release to power company

    Inspected by Matt Forsyth

  14. Jul 1, 2025

    Passed: Electrical - 2nd Rough-In

    Inspected by Matt Forsyth

  15. Jul 1, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  16. Jul 1, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  17. Jul 1, 2025

    Passed: Plumbing/Gas - Tub Set/Shower Pan

    Tub Tested

    Inspected by Matt Forsyth

  18. Jul 17, 2025

    Passed: Building - Insulation

    Walls And Ceiling Inspected Pull Down Stairs In Garage

    Inspected by Matt Forsyth

  19. Jan 7, 2026

    Passed: Building - Spot Check

    Permanent Power Next Inspection Septic Needed

    Inspected by Matt Forsyth

  20. Mar 6, 2026

    Septic Release Inspection

    Inspected by Health Dept

  21. Apr 1, 2026

    Passed: Electrical - Permanent Power

    Inspected by Matt Forsyth

  22. Apr 1, 2026

    Release to power company

    Inspected by Matt Forsyth

  23. Apr 6, 2026

    Passed: Building - Window Attachment

    Inspected by Matt Forsyth

  24. Jun 17, 2026

    Passed: Building - Final

    *all Requirements Met To Release Co-- 6.18.26 Mg

    Inspected by Matt Forsyth

Documents