Roof Replacement or Repair
Permit
| Application #: | 67415 |
| Permit #: |
000051026 |
| Related Permit: |
|
| Submitted: | Tuesday, October 8, 2024 |
| Issued: | Friday, October 11, 2024 |
| Expires: | Tuesday, November 12, 2024 |
| Completed: | Tuesday, November 12, 2024 |
| Status: |
Completed |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0395C |
| Type Roofing Job |
Overlay with Metal |
| Type of structure |
House |
| Commercial or Residential |
Residential |
| Roof Area (for this job) Sq Ft |
4600 |
| No. of Stories |
1 |
| Roof Pitch |
4:12 or Greater |
| Is the existing roof being removed? |
No |
| Explain if not removing the existing roofing material? |
Metal over existing shingles |
| Type of New Roofing Product |
Metal |
| Florida Product Approval Number |
17992.IR2 |
| Product Manufacturer |
Capital Metal |
| Product Description |
29 Gauge Metal |
| Building Code Edition |
2023 Florida Building Code 8th Edition and 2020 National Electrical Code |
| Sealed roof decking options: (Must select an option.) |
Other (explain) |
| Sealed roof decking explanation for other option. |
pine centers over existing shingles |
| Ventilation: |
Ridge Vent |
| Flashing: |
Replace All |
| Drip Edge: |
Replace All |
| Valley Treatment: |
New Metal |
| Any cable and/or race-way wiring located on or within the roof assembly? |
No |
Review Notes
| 10/8/2024 |
Application pending. |
| 10/8/2024 |
Application submitted by applicant. |
| 10/11/2024 |
Final Review - Payment Needed |
| 10/11/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Kevin L Bedenbaugh Jr Plumb Level Construction Co Llc
|
CCC1329482 |
Roofing Contractor |
Contractor |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Re-Roof - In Progress |
Roof In Progress, |
Gary Pitzer |
10/22/2024 |
| Failed: Re-Roof - Final |
1.need More Photo To Support Affidavit, 2 Several Places Starter Trim Does Not Meet Fascia, 3. Fascia Missing In One Place And Another Fascia Is Not Behind Roof Trim, 4. One Ridge Has Opening That Needs Closed, 5. Owner Unhappy With Job And Wants To Wait Till After Heavy Rain To Close Permit |
Gary Pitzer |
11/4/2024 |
| Passed: Re-Roof - Final |
Owner Not On Site. Contractor Stated That He Explain The Roof Details With Him |
Gary Pitzer |
11/12/2024 |