| Rescheduled 10/14/2024:Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
10/8/2024 |
| Rescheduled 10/11/2024:Plumbing/Gas - 1st Underground Rough–In |
|
Troy Crews |
10/8/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Anthony Aslan |
10/9/2024 |
| Failed: Building - Monolithic Slab |
Waiting On Pictures Of Rebar By A/c Chase And Drain Pipe |
Anthony Aslan |
10/16/2024 |
| Cancelled: Engineering - Setbacks |
|
Anthony Aslan |
10/16/2024 |
| Passed: Building - Monolithic Slab |
Corrections Made |
Anthony Aslan |
10/22/2024 |
| Passed: Engineering - Setbacks |
Appears Within Setbacks |
Anthony Aslan |
10/22/2024 |
| Passed: Building - Framing |
Metal Building Shell |
Anthony Aslan |
2/4/2025 |
| Passed: Electrical - 2nd Rough-In |
|
Anthony Aslan |
2/4/2025 |
| Passed: Mechanical - Rough In |
|
Anthony Aslan |
2/4/2025 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Anthony Aslan |
2/4/2025 |
| Passed: Building - Insulation |
Spray Foam All |
Anthony Aslan |
2/10/2025 |
| Passed: Electrical - Permanent Power |
Need Septic Release |
Anthony Aslan |
4/25/2025 |
| Release to power company |
Rec'd Septic Final |
Emaleigh Williams |
5/14/2025 |
| Septic Release Inspection |
|
Health Dept |
5/14/2025 |
| Passed: Building - Final |
Island Outlets And Right Of Sink ( Hot Ground Hot Neutral )--- Blower Door(rec'd) & Termite Final(rec'd) Required Prior To Co-- 5.20.25 Mg |
Anthony Aslan |
5/20/2025 |