Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 460 SW MARYNIK DR
HIGH SPRINGS, FL 32643
Parcel #: 10006-213
Acres: 5.33
Owner: Mcalhany Martin J, Mcalhany Rebekah C
Subdivision: River Rise Residential Unit 1
Zoning: A-3
Flood Zone: X
District: 4
Application #: 66712
Permit #: 000050921
Related Permit:
Submitted: Tuesday, August 20, 2024
Issued: Wednesday, October 30, 2024
Expires: Friday, September 12, 2025
Completed: Friday, September 12, 2025
Status: Completed
Septic Release? Yes
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0527C
Type Roofing Job Overlay with Metal
Type of structure House
Commercial or Residential Residential
Roof Area (for this job) Sq Ft 18
No. of Stories 1
Roof Pitch 2:12 to 4:12
Is the existing roof being removed? No
Explain if not removing the existing roofing material? metal over existing shingle with purlins
Type of New Roofing Product Metal
Florida Product Approval Number l # 17992.1 R4
Product Manufacturer CAPITAL METAL SUPPLY, INC.
Product Description Min. 29 Ga. Capital Rib Roof Panel over 1x4 Wood Purlins over 7/16” OSB
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.) a minimum 4-inch wide strip of selfadhering polymer-modified bitumen complying with ASTM D1970 or a minimum 3 ¾ - inch wide strip of selfadhering flexible flashing tape complying with AAMA 711, applied over all joints in the roof decking. A felt underlayment complying with ASTM D226 Type II, ASTM D4869 Type Ill or IV, or ASTM D6757, or a synthetic underlayment meeting the performance requirements specified, is required to be applied over the strips/tape over the entire roof.
Ventilation: Ridge Vent
Flashing: Use Existing
Drip Edge: Replace All
Valley Treatment: New Metal
Any cable and/or race-way wiring located on or within the roof assembly? No
Review Notes
8/20/2024 Point Review - Printed-Online Application
8/21/2024 Zoning Review - Reviewed
8/26/2024 Plan Review - Plumbing Approved
8/26/2024 Plan Review - Mechanical Approved
8/26/2024 Plan Review - Electrical Approved
8/26/2024 Plan Review - Building Approved
8/26/2024 Plan Review - Reviewed
8/26/2024 Final Review - Documents Required
8/27/2024 Final Review - Documents Required
9/11/2024 Final Review - Documents Required
9/24/2024 Final Review - Payment Needed
10/1/2024 Permit Issued
10/30/2024 Permit Reissued
5/21/2025 Final Review - Complete
Contractors
Name/ Business License Title Role
Matthew Clark
Matthew Clark Construction Llc
Liability Insurance & Workers Comp Expired.
CRC1330231 Cert. Residential Contractor
David D Clark
Clark Electric Inc
EC13003577 Electrical Contractor Subcontractor
Timothy D Shatto
Shatto Heating & Air, Inc.
CAC057875 A/c Class B Subcontractor
Paul K Coleman
Colemans Plumbing Inc.
CFC1425624 Certified Plumbing Subcontractor
Benjamin T Keeler
Keeler Roofing, Llc
CCC1330509 Cert. Roofing Subcontractor
Inspections
Inspection Notes Performed By Date
Passed: Electrical - Temporary Service Anthony Aslan 10/31/2024
Release to power company Anthony Aslan 10/31/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Anthony Aslan 10/31/2024
Passed: Building - Monolithic Slab Anthony Aslan 11/7/2024
Passed: Engineering - Setbacks Anthony Aslan 11/7/2024
Failed: Building - Wall Sheathing Missing Nails Anthony Aslan 12/4/2024
Failed: Building - Roof Decking No Ladder Anthony Aslan 12/4/2024
Passed: Building - Ext Strapping/Wall Sheathing Strapping Only Anthony Aslan 12/4/2024
Cancelled: Building - Roof Decking Neonta Anderson 12/5/2024
Cancelled: Building - Wall Sheathing Neonta Anderson 12/5/2024
Passed: Building - Roof Decking Anthony Aslan 12/6/2024
Passed: Building - Wall Sheathing Anthony Aslan 12/6/2024
Passed: Building - Framing Anthony Aslan 1/21/2025
Passed: Building - Strapping Anthony Aslan 1/21/2025
Passed: Electrical - 2nd Rough-In Anthony Aslan 1/21/2025
Passed: Mechanical - Rough In Anthony Aslan 1/21/2025
Passed: Plumbing/Gas - 2nd Rough-In Looking For Pressure At Insulation Anthony Aslan 1/21/2025
Passed: Building - Insulation Walls And Vaults Anthony Aslan 1/27/2025
Septic Release Inspection Health Dept 2/17/2025
Passed: Electrical - Permanent Power Anthony Aslan 5/1/2025
Release to power company Re-release To Clay Melissa Garber 5/27/2025
Passed: Building - Final All Requirements Met To Release Co-- 9.12.25 Mg Anthony Aslan 9/8/2025