Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit
Address 312 SW HAMMOCK HILL CIR
LAKE CITY, FL 32024
Parcel #: 09736-113
Acres: 4.16
Owner: Agudelo Jairo Antonio, Agudelo Maria Margarita
Subdivision: Pine Oak Hammock
Zoning: A-3
Flood Zone: X
District: 4
Application #: 65631
Permit #: 000050888
Related Permit: Right-of-Way Access/Driveway:
Submitted: Friday, May 31, 2024
Issued: Monday, September 23, 2024
Expires: Monday, April 28, 2025
Completed:
Status: Permit Issued
Septic Release? Yes
Notes:
ZONING: DFE OF 147' PER SUBDIVISION PLAT. SURVEYOR OR ENGINEER LETTER PRIOR TO FINAL INSPECTION GIVING FINISHED FLOOR ELEVATION OF 147' OR HIGHER.
Job Details
This is the construction of a Single Family Dwelling
Heated Area (Sqft) 1100
Total Area (Sqft) 1358
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Septic# (00-0000) or (X00-000) 24-0149
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Elevation regulation Subdivision Plat
Finished floor requirement DFE 147'
Requirement needed By Final Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved No
Fema map number 12023C0505C
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Review Notes
5/31/2024 Point Review - Reviewed NEEDED * ROOF OPTION TO BE SELECTED
6/4/2024 Zoning Review - Reviewed NEEDED * ROOF OPTION TO BE SELECTED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT.
6/7/2024 Plan Review - Corrections Needed NEEDED **NO SQFT ON CHECK LIST * ROOF OPTION TO BE SELECTED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT.
6/11/2024 Plan Review - Corrections Needed NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * ROOF OPTION TO BE SELECTED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT.
6/18/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * ROOF OPTION TO BE SELECTED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT.
6/24/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * ROOF OPTION TO BE SELECTED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT.
7/1/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * ROOF OPTION TO BE SELECTED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT.
7/9/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT. SURVEYOR OR ENGINEER LETTER PRIOR TO FINAL INSPECTION GIVING FINISHED FLOOR ELEVATION OF 147' OR HIGHER.
7/15/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT. SURVEYOR OR ENGINEER LETTER PRIOR TO FINAL INSPECTION GIVING FINISHED FLOOR ELEVATION OF 147' OR HIGHER.
7/22/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT. SURVEYOR OR ENGINEER LETTER PRIOR TO FINAL INSPECTION GIVING FINISHED FLOOR ELEVATION OF 147' OR HIGHER.
7/29/2024 Plan Review - On Hold-Incomplete NEEDED **PLANS NOT CURRENT CODE, CURRENT CODE IS FBC2023 & ELECTRICAL 2020 **NO SQFT ON CHECK LIST * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT. SURVEYOR OR ENGINEER LETTER PRIOR TO FINAL INSPECTION GIVING FINISHED FLOOR ELEVATION OF 147' OR HIGHER.
7/30/2024 Plan Review - Documents Required NEEDED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J ZONING: DFE OF 147' PER SUBDIVISION PLAT. SURVEYOR OR ENGINEER LETTER PRIOR TO FINAL INSPECTION GIVING FINISHED FLOOR ELEVATION OF 147' OR HIGHER.
8/2/2024 Plan Review - Documents Required NEEDED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J
8/19/2024 Plan Review - Documents Required NEEDED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J
8/27/2024 Plan Review - Documents Required NEEDED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J
9/3/2024 Plan Review - Documents Required NEEDED * UPON PLAN REVIEW - ENERGY CALCS & MANUAL J
9/5/2024 Plan Review - Building Approved
9/5/2024 Plan Review - Electrical Approved
9/5/2024 Plan Review - Mechanical Approved
9/5/2024 Plan Review - Plumbing Approved
9/5/2024 Plan Review - Fuel/Gas Approved
9/5/2024 Plan Review - Reviewed
9/11/2024 Final Review - Reviewed
9/11/2024 Final Review - Payment Needed
9/18/2024 Final Review - Payment Needed
9/23/2024 Permit Issued Permit #000050888 created and approved.
Contractors

This is an owner builder project.

Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 6/28/2024
Passed: Electrical - Temporary Service Anthony Aslan 10/30/2024
Release to power company Anthony Aslan 11/4/2024