Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Commercial Construction Permit
Address 466 SW WINDSWEPT GLN
LAKE CITY, FL 32024
Parcel #: 03120-705
Acres: 1.13
Owner: Trafco Llc,
Subdivision: Windswept Industrial Unit 7
Zoning: ILW
Flood Zone: X
District: 3
Application #: 66794
Permit #: 000050885
Related Permit:
Submitted: Friday, August 30, 2024
Issued: Monday, September 23, 2024
Expires: Friday, December 20, 2024
Completed: Friday, December 20, 2024
Status: Completed
Septic Release? Yes
Notes:
SDP 240802 APPROVED FINISHED FLOOR 104.0 ELEVATION CONFIRMATION FROM SURVEYOR DUE AT SLAB SHELL PERMIT OWNER TO PULL BUILD OUT PERMIT **ELEVATION CONFIRMATION REC'D AT 104.01'
Job Details
This is the construction of a: 70x100 warehouse with 55'x12' office space
Describe commercial use: Warehouse/office
Heated Area (Sqft) 660
Total Area (Sqft) 7660
Stories 1
Building Height 14
Driveway access to property: Driveway permit
Is there a Fire Sprinkler System? No
Building Code Construction Type III
Building Code Element B
Building Code Occupancy Types Business
Setbacks Front 20
Setback Side 1 22
Setback Side 2 72.74
Setback Rear 151.20
Septic# (00-0000) or (X00-000) x-city
Dev Permit # F023-
Service Amps 200
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Elevation regulation Site & Development Plan
Finished floor requirement 104.0
Requirement needed By Nailing Inspection
Document needed is a Surveyor letter giving the Finished Floor Elevation
Document receieved Yes
Fema map number 12023C0381D
Sealed roof decking options. (Must select one.) Other (explain)
Sealed roof decking explanation for other option. steel building
Review Notes
8/26/2024 Application pending.
8/30/2024 Application submitted by applicant.
9/5/2024 Point Review - Printed-Online Application NEEDED * 911 ADDRESS * ROBERT PARRISH UPDATED WORKERS COMP AND LIABILITY * SITE PLAN SETBACK CELLS TO BE COMPLETED (PART OF CONSTRUCTION DETAILS)
9/11/2024 Zoning Review - Reviewed NEEDED * 911 ADDRESS NEED SEALEDFOUNDATION PLANS METAL BUILDING SUPPLIER HAS NOTE BY OTHERS
9/11/2024 Plan Review - Documents Required NEEDED * 911 ADDRESS NEED SEALEDFOUNDATION PLANS METAL BUILDING SUPPLIER HAS NOTE BY OTHERS
9/17/2024 Plan Review - Documents Required NEEDED * 911 ADDRESS FOUNDATION PLAN INDICATES SEAL CORRUPTED PLEASE E-MAIL ORIGINAL FROM ENGINEER TO TROY THANKS
9/18/2024 Plan Review - Plumbing Approved NEEDED * 911 ADDRESS AWAITING I.T. FINAL APPROVAL
9/18/2024 Plan Review - Building Approved NEEDED * 911 ADDRESS AWAITING I.T. FINAL APPROVAL
9/18/2024 Plan Review - Reviewed NEEDED * 911 ADDRESS AWAITING I.T. FINAL APPROVAL
9/18/2024 Final Review - Processing NEEDED * 911 ADDRESS AWAITING I.T. FINAL APPROVAL
9/23/2024 Permit Issued Permit #000050885 created and approved.
12/20/2024 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Robert Parrish
P C Quality Metal Construction, Inc. (union Lasteel Metal Buildings)
CBC059948 Building Contractor Contractor
Inspections
Inspection Notes Performed By Date
Passed: Fire - Plan Review All Setbacks Met. Cpt. Shane Overstreet 9/9/2024
Rescheduled 10/14/2024:Plumbing/Gas - 1st Underground Rough–In Troy Crews 10/11/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Water Supply And Waste Pipe Under Slab Inspected Matt Forsyth 10/14/2024
Passed: Building - Monolithic Slab Troy Crews 10/18/2024
Passed: Engineering - Setbacks Troy Crews 10/18/2024
Cancelled: Building - Slab Troy Crews 10/18/2024
Cancelled: Building - Footer Troy Crews 10/18/2024
Cancelled: Engineering - Setbacks Troy Crews 10/18/2024
Certificate-Release Certificate Closing Shell Permit And Issuing A Build Out Troy Crews 12/13/2024
Passed: Building - Final Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. Troy Crews 12/20/2024
Cancelled: Building - Framing Troy Crews 12/20/2024