Passed: Engineering - Final Driveway
Drive Constructed As Permitted, But The Outfall Of The Side Drain Has Some Erosion That Needs To Be Repaired-- Chad Spoke With Owner, Who Stated They Would Correct. Co Pending Final Ok From County Engineer-- 5.18.25 Mg-- Ok Per Chad-- 7.1.25 Mg
Inspected by Chad Williams