| Address |
, |
| Parcel #: |
00469-108 |
| Acres: | 9.89 |
| Owner: | Kent John Brian, Kent Ashley Nicole |
| Subdivision: | Shirley Gorospe Tract (division Of Land) |
| Zoning: | ESA-2 |
| Flood Zone: | X |
| District: | 2 |
| Application #: | 66491 |
| Permit #: |
000050823 |
| Related Permit: |
|
| Submitted: | Friday, August 2, 2024 |
| Issued: | Monday, September 16, 2024 |
| Expires: | Wednesday, February 5, 2025 |
| Completed: | Wednesday, February 5, 2025 |
| Status: |
Completed |
| Septic Release? |
N/A |
| Finished floor requirement |
|
| Fema map number |
12023C0370C |
| Standards |
Culvert installation shall conform to the approved site plan standards |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Type of connection for access road |
Private Road/Addressing |
| Type of construction of property |
Site Built Home |
| If the type of construction is not listed, please describe below |
Modular home |
| Normal vehicle usage: |
Automobiles |
| Side Drain required |
Yes |
| Side Drain Size (diameter in inches) |
18 |
| Study Required |
No |
| Estimated Number of Vehicle trips per day |
3 |
| Is the access for commercial or residential use? |
Residential |
| County Road Type |
Paved |
| 8/2/2024 |
Pending applicant completion and submission. |
| 8/10/2024 |
Email confirmation reminder sent. |
| 8/24/2024 |
Email confirmation reminder sent. |
| 9/3/2024 |
Application submitted by applicant. |
| 9/3/2024 |
Pending Public Works Application Approval |
| 9/10/2024 |
Application Approved by Public Works |
| 9/11/2024 |
Final Review - Payment Needed |
| 9/11/2024 |
Pending initial driveway inspection |
| 9/16/2024 |
Permit Issued |
| Name / Business |
License |
Title |
Role |
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
9/3/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
9/12/2024 |
| Rescheduled 2/5/2025:Engineering - Final Driveway |
|
Melissa Garber |
1/29/2025 |
| Passed: Engineering - Final Driveway |
|
Smith, Blake |
2/5/2025 |