Permit Details

Permit Search

Permit

Mobile Home

277 SW WHEAT PL
LAKE CITY, FL 32024

Permit #
000050808
Application #
66487
Status Permit Renewed This permit expired on Apr 29, 2026.
  1. Submitted Aug 1, 2024
  2. Issued Oct 31, 2025
  3. Expires Apr 29, 2026
  4. Completed —

Property

Parcel #
03626-071
Owner
Schneiders Lawrence David, Schneiders Mary Sue
Acres
2.14
Subdivision
Hi-dri Acres Unit 2
Zoning
ESA-2
Flood zone
X
District
2

Permit

Status
Permit Renewed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Minimum Requirement
Finished floor requirement
One foot above the road
Fema map number
12023C0390C
Mobile Home is a:
Single Wide
Year Built
1999
Width (Ft.In)
16
Length (Ft.In)
76
Driveway access to home:
Existing Drive
Installation Decal #
114081
Special temporary use permit number:
240802
Septic #
24-0617
Setbacks Front
30'
Setback Side 1
25'
Setbacks Rear
25'
Dev Permit #
F023-
Setback Side 2
25'
Are you applying for a 5 year temporary permit?
Yes
Wind Zone?
2
Residential or Commercial Use?
Residential
Service Amps
200
How many of bedrooms does this home have?
3
How many bathrooms does this home have?
2

Status & Review History

  1. Point Review - Reviewed
  2. Zoning Review - Reviewed
  3. Plan Review - Reviewed
  4. Final Review - Documents Required
  5. Final Review - Documents Required
  6. Final Review - Payment Needed
  7. Permit Issued
  8. Permit Renewed

Contractors

  • Kenneth Bramlett

    Bigfoot Transport

    License
    IH1025216
    Title
    Mh Installer (ih)
    Role
    Contractor

Inspections

  1. Aug 22, 2024

    Septic Release Inspection

    Inspected by Health Dept

  2. Sep 5, 2024

    Passed: Mobile Home - In County Pre-Mobile Home before set-up

    Inspected by Gary Pitzer

  3. Jan 3, 2025

    Passed: Engineering - Setbacks

    Appear To Be As Plot Plan, No Markers

    Inspected by Gary Pitzer

  4. Jan 3, 2025

    Failed: Mobile Home - Mobile Home Set-Up Final

    1. Need Anti-occident Compound -on All Aluminum Wire Terminations, 2. Steps And Landing Need To Be Stable With All Steps The Same Height And Guard Rail In Place And Secure, 3. Plumbing No Completed, 4. Secure Siding In Several Places

    Inspected by Gary Pitzer

  5. Oct 31, 2025

    Failed: Mobile Home - Mobile Home Set-Up Final

    Hvac Needs To Be Complete Four Final Inspection... Need Steps At Exterior Doors

    Inspected by Christian Allen

  6. Oct 31, 2025

    Passed: Engineering - Setbacks

    Appears To Be Within Setbacks

    Inspected by Christian Allen

  7. May 8, 2026

    Failed: Mobile Home - Mobile Home Set-Up Final

    Ac Not Connected And Front Steps Need Repair

    Inspected by Troy Crews