Permit Details

Permit Search

Permit

New Residential Construction

264 NW SYLVI DR
LAKE CITY, FL 32055

Permit #
000050791
Application #
66265
Status Completed
  1. Submitted Jul 18, 2024
  2. Issued Nov 1, 2024
  3. Expires Jan 21, 2026
  4. Completed Jul 29, 2025

Property

Parcel #
02372-058
Owner
Ic Construction, Llc,
Acres
1.06
Subdivision
Star Lake Estates
Zoning
RSF-2
Flood zone
X
District
3

Permit

Status
Completed
Septic release
Released
Related permit
—

Job Details

Elevation regulation
Engineers Elevation Letter
Finished floor requirement
12" above adjacent ground for entire perimeter
Fema map number
12023C0280D
This is the construction of a
Single Family Dwelling
Setbacks Front
25'
Setback Side 1
10'
Setback Side 2
10'
Setbacks Rear
15'
Stories
2
Heated Area (Sqft)
3026
Total Area (Sqft)
4041
Building Height
25
Building Code Construction Type
V
Building Code Element
B
Building Code Occupancy Types
Residential
Occupancy Use Title
single family dwelling
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000)
24-0610
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition)
two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps
200

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. Point Review - Printed-Online Application
  4. Zoning Review - Reviewed
  5. Plan Review - Building Approved
  6. Plan Review - Electrical Approved
  7. Plan Review - Mechanical Approved
  8. Plan Review - Plumbing Approved
  9. Plan Review - Fuel/Gas Approved
  10. Plan Review - Reviewed
  11. Final Review - Payment Needed
  12. Permit Issued
  13. Permit Reissued

Contractors

  • Isaiah Cully

    Ic Construction Llc

    License
    CBC1259655
    Title
    Building Contractor
    Role
    Contractor
  • Everton D Ruddock

    D&s Lighting Inc

    License
    EC13003800
    Title
    Electrical Contractor
    Role
    Subcontractor
  • Clinton G Wilson

    Wilson Heat & Air Inc

    License
    CAC057886
    Title
    Class B A/c
    Role
    Subcontractor
  • Cody Barrs

    Barrs Plumbing Inc

    License
    CFC1427145
    Title
    Plumbing Contractor
    Role
    Subcontractor
  • Tyler M Turner

    Tmt Roofing Llc

    License
    CCC1330410
    Title
    Cert Roofing
    Role
    Subcontractor

Inspections

  1. Sep 23, 2024

    Passed: Building - Footer

    Need Porta Let For Workers. Permit Box For Docs And Dumpster For Debrie

    Inspected by Matt Forsyth

  2. Sep 23, 2024

    Passed: Engineering - Setbacks

    Inspected by Matt Forsyth

  3. Oct 15, 2024

    Passed: Plumbing/Gas - 1st Underground Rough–In

    Waste Pipe Only Inspected

    Inspected by Matt Forsyth

  4. Oct 22, 2024

    Passed: Building - Slab

    Rebar On Back Porch Needs To Be Chaired Up

    Inspected by Matt Forsyth

  5. Oct 22, 2024

    Passed: Electrical - Temporary Service

    Inspected by Matt Forsyth

  6. Oct 22, 2024

    Release to power company

    Inspected by Matt Forsyth

  7. Dec 3, 2024

    Passed: Building - Wall Sheathing

    Inspected by Matt Forsyth

  8. Dec 3, 2024

    Passed: Building - Roof Decking

    Inspected by Matt Forsyth

  9. Jan 6, 2025

    Passed: Building - Framing

    No Front Door Or Garage Door Installed Yet

    Inspected by Matt Forsyth

  10. Jan 6, 2025

    Failed: Electrical - 2nd Rough-In

    Need Draft Stop Protection Above Electrical Panel

    Inspected by Matt Forsyth

  11. Jan 6, 2025

    Passed: Mechanical - Rough In

    Inspected by Matt Forsyth

  12. Jan 6, 2025

    Passed: Plumbing/Gas - 2nd Rough-In

    Inspected by Matt Forsyth

  13. Jan 17, 2025

    Passed: Building - Insulation

    Draft Stop Above Electrical Panel Completed

    Inspected by Matt Forsyth

  14. Mar 25, 2025

    Septic Release Inspection

    Inspected by Health Dept

  15. Apr 1, 2025

    Passed: Electrical - Permanent Power

    Driveway

    Inspected by Matt Forsyth

  16. Apr 3, 2025

    Release to power company

    Final Drive Passed

    Inspected by Melissa Garber

  17. Apr 3, 2025

    Submitted Power Release through FPL Portal

    Inspected by Ward, Emaleigh C.

  18. Jul 25, 2025

    Passed: Building - Final

    All Requirements Met To Release Co-- 7.29.25 Mg

    Inspected by Anthony Aslan