Permit Details

Permit Search

Permit

Roof Replacement or Repair

657 SE COUNTRY CLUB RD
LAKE CITY, FL 32025

Permit #
000050730
Application #
66891
Status Completed
  1. Submitted Sep 3, 2024
  2. Issued Sep 4, 2024
  3. Expires Aug 2, 2025
  4. Completed Feb 3, 2025

Property

Parcel #
07218-000
Owner
Boozer William J, Boozer Marilee S
Acres
0.25
Subdivision
Country Club Estates Replat
Zoning
RSF-2
Flood zone
X
District
4

Permit

Status
Completed
Septic release
N/A
Related permit
—

Job Details

Finished floor requirement
Fema map number
12023C0311D
Type Roofing Job
Re-Cover - New Material over Existing
Further Job Details (Explain if decking is being replaced and or Repairs are being done.)
placing metal over shingles
Type of structure
House
Commercial or Residential
Residential
Roof Area (for this job) Sq Ft
1795
No. of Stories
1
Roof Pitch
4:12 or Greater
Is the existing roof being removed?
No
Explain if not removing the existing roofing material?
Placing metal over Shingles
Type of New Roofing Product
Metal
Florida Product Approval Number
10124R35
Product Manufacturer
American Weatherstar
Product Description
shingles
Building Code Edition
2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Sealed roof decking options: (Must select an option.)
a self-adhering polymer-modified bitumen underlayment complying with ASTM D1970 applied over the entire roof.
Ventilation:
Off-ridge Vent
Flashing:
Replace All
Drip Edge:
Replace All
Valley Treatment:
New Metal
Any cable and/or race-way wiring located on or within the roof assembly?
No

Status & Review History

  1. Application pending.
  2. Application submitted by applicant.
  3. City of Lake City Utilities Notified.
  4. Final Review - Payment Needed
  5. Permit Issued

Contractors

  • Harry D Anderson Jr

    Southeastern Coatings & Waterproofing, Inc.

    License
    CCC1326114
    Title
    Roofing Contractor
    Role
    Contractor

Inspections

  1. Jan 30, 2025

    Passed: Re-Roof - In Progress

    Roof Complete

    Inspected by Anthony Aslan

  2. Feb 3, 2025

    Passed: Re-Roof - Final

    Metal Roof Overlay Completed

    Inspected by Gary Pitzer