Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Communications Tower Permit

Address
,
Parcel #: 09563-002
Acres: 0.23
Owner: The George W Hunter Revocable Trust, (verizon)
Subdivision:
Zoning: CHI
Flood Zone: X
District: 4
Application #: 65988
Permit #: 000050716
Related Permit:
Submitted: Monday, July 8, 2024
Issued: Monday, July 28, 2025
Expires: Tuesday, July 29, 2025
Completed: Tuesday, July 29, 2025
Status: Completed
Septic Release? na
Notes:

Job Details
Finished floor requirement
Fema map number 12023C0415C
This is the construction of a: TOWER WORK: REMOVE (3) SECTOR FRAME MOUNT(S), (12) ANTENNA(S), (3) RRU(s), AND (16) 1-5/8" COAX CABLE(S). INSTALL (3) SECTOR FRAME MOUNT(S) (9) ANTENNA(S), (6) RRU(s), (1) OVP(s), AND (1) 6x12 HYBRIFLEX (1-1/4" HYBRIFLEX) CABLE(S). GROUND WORK: REMOVE (1) CDMA CABINET(S), (1) 6201 ODE CABINET(S), (1) EBRE CABINET(S), (6) RRU(s), (1) 200A PPC(s), (1) ATS(s), (1) 30KW LP GENERATOR(S), (1) 250 GAL. PROPANE TANK(S), AND BATTERY(IES). INSTALL (3) HT200ET BATTERY STRING(S), (1) 200A ILC(s), (1) 50KW LP GENERATOR(S), (1) 500 GALLON LP TANK(S), (1) BATTERY CABINET(S), AND (1) CONSOLIDATED CABINET(S). INSTALL ROUTER(S), BASEBAND(s), UPCONVERTER(s), AND SITEBOSS IN PROPOSED CONSOLIDATED CABINET(s).
Select access to property: Existing Drive
Total Estimated Cost 30000
Tower Height 300
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Is this a new or existing tower? Existing
Service Amps 30
Review Notes
6/24/2024 Application pending.
7/8/2024 Application submitted by applicant.
8/7/2024 Zoning Review - Reviewed NEEDED * OWNERS PHONE NUMBER * FULL APPLICANT ADDRESS * ARCHITECT/ENGINEER CELL TO BE FILLED IN * OWNER AND CONTRACTOR SIGNATURE PAGE
8/7/2024 Plan Review - Building Approved NEEDED * OWNERS PHONE NUMBER * FULL APPLICANT ADDRESS * ARCHITECT/ENGINEER CELL TO BE FILLED IN * OWNER AND CONTRACTOR SIGNATURE PAGE
8/7/2024 Plan Review - Reviewed NEEDED * OWNERS PHONE NUMBER * FULL APPLICANT ADDRESS * ARCHITECT/ENGINEER CELL TO BE FILLED IN * OWNER AND CONTRACTOR SIGNATURE PAGE
8/7/2024 Point Review - Corrections Needed NEEDED * OWNERS PHONE NUMBER * FULL APPLICANT ADDRESS * ARCHITECT/ENGINEER CELL TO BE FILLED IN * OWNER AND CONTRACTOR SIGNATURE PAGE
8/7/2024 Final Review - Corrections Needed NEEDED *OWNERS PHONE NUMBER *FULL APPLICANT ADDRESS *ARCHITECT/ENGINEER CELL TO BE FILLED IN *OWNER AND CONTRACTOR SIGNATURE PAGE --- WHAT WAS UPLOADED IS CONTRACTOR LETTER OF AUTHORIZATION- SIGNED BY MARGARET ROBINSON OR TEP REPRESENTATIVE- IF TEP REPRESENTATIVE, WILL NEED LETTER OR AUTHORIZATION FROM TEP AS TO WHO IS AUTHORIZED TO SIGN AS OWNER ON BEHALF OF TEP *GEORGE WILCOX TO COMPLETE REGISTRATION-- CONTACT 386-758-1008 FOR DETAILS
8/19/2024 Final Review - Corrections Needed NEEDED: *OWNER AND CONTRACTOR SIGNATURE PAGE --- WHAT WAS UPLOADED IS CONTRACTOR LETTER OF AUTHORIZATION- SIGNED BY MARGARET ROBINSON OR TEP REPRESENTATIVE- IF TEP REPRESENTATIVE, WILL NEED LETTER OR AUTHORIZATION FROM TEP AS TO WHO IS AUTHORIZED TO SIGN AS OWNER ON BEHALF OF TEP *GEORGE WILCOX TO COMPLETE REGISTRATION-- PENDING PAYMENT
8/28/2024 Final Review - Corrections Needed NEEDED: *OWNER AND CONTRACTOR SIGNATURE PAGE --- MUST BE SIGNED BY MARGARET ROBINSON OR TEP REPRESENTATIVE- IF TEP REPRESENTATIVE, WILL NEED LETTER OR AUTHORIZATION FROM TEP AS TO WHO IS AUTHORIZED TO SIGN AS OWNER ON BEHALF OF TEP *CONTRACTOR LETTER OF AUTHORIZATION IS FROM JOE LESLIE-- WE WILL NEED ONE FROM GUSTAVO N DEZZUTO FOR ABIGAIL
9/3/2024 Final Review - Reviewed
9/3/2024 Final Review - Payment Needed
9/3/2024 Permit Issued Permit # created and approved from payment.
7/9/2025 Final Review - Payment Needed
7/24/2025 Final Review - Complete
7/28/2025 Permit Reissued Permit reissued to reflect updated information.
Contractors
Name/ Business License Title Role
Gustavo N Dezzuto
Sba Network Services Llc
CGC1524899 Cert. General Contractor
George Wilcox
Glw Electric Llc
EC13010419 Cert. Electrical Subcontractor
Inspections
Inspection Notes Performed By Date
Cancelled: Building - Footer Troy Crews 7/29/2025
Cancelled: Engineering - Setbacks Troy Crews 7/29/2025
Cancelled: Building - Slab Troy Crews 7/29/2025
Cancelled: Electrical - Permanent Power Troy Crews 7/29/2025
Passed: Building - Final Troy Crews 7/29/2025