Inspection |
Notes |
Performed By |
Date |
Passed: Engineering - Setbacks |
|
Gary Pitzer |
9/6/2024 |
Passed: Building - Footer |
2# 5 Wired And Chairs |
Gary Pitzer |
9/6/2024 |
Passed: Plumbing/Gas - 1st Underground Rough–In |
|
Gary Pitzer |
9/24/2024 |
Passed: Building - Slab |
Plastic Down And Taped, Rebar Around Perimeter Wired, Please Forward Load Tickets For Fiber Crete |
Gary Pitzer |
10/2/2024 |
Passed: Building - Ext Strapping/Wall Sheathing |
|
Gary Pitzer |
11/7/2024 |
Passed: Building - Roof Decking |
|
Gary Pitzer |
11/7/2024 |
Passed: Building - Wall Sheathing |
|
Gary Pitzer |
11/7/2024 |
Passed: Building - Framing |
|
Gary Pitzer |
12/4/2024 |
Passed: Mechanical - Rough In |
|
Gary Pitzer |
12/4/2024 |
Passed: Plumbing/Gas - 2nd Rough-In |
Water Preasured |
Gary Pitzer |
12/4/2024 |
Passed: Plumbing/Gas - Tub Set/Shower Pan |
Tub Holding Water |
Gary Pitzer |
12/4/2024 |
Passed: Electrical - 2nd Rough-In |
Electrical In Progress With Putting Wires In Boxes, All Point Of Attachments And Box Locations Ok |
Gary Pitzer |
12/4/2024 |
Passed: Building - Insulation |
Foam Walls And Roof |
Gary Pitzer |
12/18/2024 |
Cancelled: Building - Final |
|
Gary Pitzer |
4/25/2025 |
Failed: Building - Final |
1,need Final Termite' 2. Need Septic Release, 3. Get Ac Unit Pad On Top Of Dirt, 4. Vent Over Kitchen Hood Needs Sealed Into Attic Space Before Covering, 5. Furnace And Water Heater Disconnects Need Labeled |
Gary Pitzer |
4/25/2025 |
Passed: Electrical - Permanent Power |
House Only Has Disconnect ,no Need For Release, Perm Power Off Storage Shed Was Inspected Under Another Permit |
Gary Pitzer |
4/25/2025 |
Passed: Building - Final |
Cannot Closed Permit Or Release Certificate Of Occupancy Due To Missing Required Documents. |
Gary Pitzer |
5/2/2025 |