| Passed: Engineering - Setbacks |
|
Gary Pitzer |
8/27/2024 |
| Failed: Building - Footer |
No Steel In Footer |
Gary Pitzer |
8/27/2024 |
| Passed: Building - Footer |
Steel In Footer |
Anthony Aslan |
8/28/2024 |
| Passed: Engineering - Setbacks |
|
Anthony Aslan |
8/28/2024 |
| Septic Release Inspection |
|
Health Dept |
8/29/2024 |
| Passed: Plumbing/Gas - 1st Underground Rough–In |
Waste Lines Put Pressure On Water At Second Rough. |
Troy Crews |
9/16/2024 |
| Passed: Building - Slab |
Plastic And Taped,steel |
Gary Pitzer |
9/19/2024 |
| Failed: Building - Ext Strapping/Wall Sheathing |
Roof And Wall Shearing Only, No Strapping Or Wall Anchors. Please Note We Will Need Access To Interior The Rest Of Your Inspections |
Gary Pitzer |
10/11/2024 |
| Passed: Building - Framing |
|
Troy Crews |
11/27/2024 |
| Passed: Electrical - 2nd Rough-In |
|
Troy Crews |
11/27/2024 |
| Passed: Mechanical - Rough In |
|
Troy Crews |
11/27/2024 |
| Passed: Plumbing/Gas - 2nd Rough-In |
|
Troy Crews |
11/27/2024 |
| Passed: Building - Insulation |
|
Troy Crews |
12/5/2024 |
| Passed: Building - Final |
|
Troy Crews |
2/13/2025 |