Right-of-Way Access/Driveway
Permit
| Application #: | 65743 |
| Permit #: |
000050625 |
| Related Permit: |
|
| Submitted: | Friday, June 7, 2024 |
| Issued: | Wednesday, August 21, 2024 |
| Expires: | Thursday, February 17, 2028 |
| Completed: | |
| Status: |
Permit Issued |
| Septic Release? |
N/A |
Job Details
| Finished floor requirement |
|
| Fema map number |
12023C0390C |
| Building Permit # |
000049761, |
| Standards |
Shall conform to Public Works Determinations as stated below |
| Requirements |
An 18” storm pipe of approved material is required with a minimum length of 32 feet. 4” Concrete Pads shall be located on each mitered end section, and shall be 5’ wide by 7’ long |
| Status |
Permanent |
| Side Drain required |
Yes |
| Side Drain Size |
18 |
| Study Required |
No |
| County Road Type |
Paved |
| Type of connection for access road |
Rural Driveway |
| Type of construction of property |
Other |
| If the type of construction is not listed, please describe below |
Modular Home |
| Normal vehicle usage: |
Automobiles |
| Estimated Number of Vehicle trips per day |
4 |
| Is the access for commercial or residential use? |
Residential |
Review Notes
| 6/7/2024 |
Application submitted by applicant. |
| 6/7/2024 |
Pending Public Works Application Approval |
| 6/11/2024 |
Application Approved by Public Works |
| 6/11/2024 |
Final Review - Payment Needed |
| 7/26/2024 |
Final Review - Payment Needed |
| 7/26/2024 |
Pending initial driveway inspection |
| 8/16/2024 |
Point Review - Status Cleared |
| 8/16/2024 |
Point Review - Status Cleared |
| 8/21/2024 |
Permit Issued |
Contractors
| Name / Business |
License |
Title |
Role |
Inspections
| Inspection |
Notes |
Performed By |
Date |
| Passed: Engineering - ROW Access/Driveway connects to county maintained road |
|
Chad Williams |
6/7/2024 |
| Rescheduled 8/13/2024:Engineering - Initial Driveway |
|
Melissa Garber |
8/12/2024 |
| Passed: Engineering - Initial Driveway |
|
Smith, Blake |
8/20/2024 |
| Passed: Engineering - Driveway Spot Check |
Everything Is Completed |
Smith, Blake |
2/17/2025 |
| Failed: Engineering - Driveway Spot Check |
inspection Notes: Driveway Needs To Be Finalized |
Smith, Blake |
2/17/2026 |
| (Requested) Engineering-Driveway Spot Check Failure Review |
|
|
|