Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

New Residential Construction Permit

Address 1364 SW JAFUS AVE
LAKE CITY, FL 32024
Parcel #: 00358-008
Acres: 35.35
Owner: Tyre Nicholas Ronnie,
Subdivision:
Zoning: A-3
Flood Zone: X
District: 2
Application #: 65740
Permit #: 000050566
Related Permit: Right-of-Way Access/Driveway: 000050559
Submitted: Friday, June 7, 2024
Issued: Friday, August 16, 2024
Expires: Wednesday, May 7, 2025
Completed: Wednesday, May 7, 2025
Status: Completed
Septic Release? Yes
Notes:

Job Details
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0270C
This is the construction of a Single Family Dwelling
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Stories 1
Heated Area (Sqft) 1632
Total Area (Sqft) 1904
Building Height 16
Building Code Construction Type V
Building Code Element B
Building Code Occupancy Types Residential
Occupancy Use Title single family dwelling
Building Code Edition 2023 Florida Building Code 8th Edition and 2020 National Electrical Code
Septic# (00-0000) or (X00-000) 24-0559
Sealed roof decking options. (Must select one option per FBC 2023 8th Edition) two layers of felt underlayment comply ASTM 0226 Type II or ASTM D4869 Type Ill or IV, or two layers of a synthetic underlayment meeting the performance requirements specified, lapped and fastened as specified.
Service Amps 100
Review Notes
6/6/2024 Application pending.
6/7/2024 Application submitted by applicant.
6/11/2024 Point Review - Reviewed
6/11/2024 Zoning Review - Reviewed
6/14/2024 Plan Review - On Hold-Incomplete
6/17/2024 Plan Review - Documents Required
6/20/2024 Plan Review - Documents Required
7/10/2024 Plan Review - Documents Required
7/23/2024 Plan Review - Documents Required
7/30/2024 Plan Review - Plumbing Approved
7/30/2024 Plan Review - Mechanical Approved
7/30/2024 Plan Review - Electrical Approved
7/30/2024 Plan Review - Building Approved
7/30/2024 Plan Review - Reviewed
7/30/2024 Final Review - Documents Required
7/30/2024 Final Review - Documents Required
8/15/2024 Final Review - Payment Needed
8/16/2024 Permit Issued
2/18/2025 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Inspections
Inspection Notes Performed By Date
Passed: Building - Footer Matt Forsyth 8/23/2024
Passed: Engineering - Setbacks Matt Forsyth 8/23/2024
Passed: Building - Monolithic Slab Matt Forsyth 8/23/2024
Passed: Engineering - Setbacks Matt Forsyth 8/23/2024
Passed: Building - Slab Matt Forsyth 8/23/2024
Passed: Electrical - 1st Underground Rough–In Matt Forsyth 8/23/2024
Passed: Plumbing/Gas - 1st Underground Rough–In Matt Forsyth 8/23/2024
Cancelled: Electrical - Temporary Service Matt Forsyth 8/23/2024
Passed: Building - Roof Decking Matt Forsyth 9/10/2024
Passed: Building - Wall Sheathing Matt Forsyth 9/10/2024
Cancelled: Building - Ext Strapping/Wall Sheathing Matt Forsyth 9/10/2024
Passed: Building - Ext Strapping/Wall Sheathing Matt Forsyth 9/20/2024
Passed: Electrical - Temporary Service Matt Forsyth 9/20/2024
Release to power company Matt Forsyth 9/20/2024
Cancelled: Building - Framing Matt Forsyth 9/20/2024
Passed: Building - Framing Need Attic Access Matt Forsyth 10/2/2024
Passed: Electrical - 2nd Rough-In Check Stove For Plug Matt Forsyth 11/5/2024
Passed: Mechanical - Rough In Matt Forsyth 11/5/2024
Passed: Plumbing/Gas - 2nd Rough-In Matt Forsyth 11/5/2024
Passed: Plumbing/Gas - Tub Set/Shower Pan Tub Water Tested Matt Forsyth 11/5/2024
Cancelled: Building - Final Matt Forsyth 2/21/2025
Passed: Electrical - Permanent Power Need Septic Release Matt Forsyth 2/21/2025
Release to power company Matt Forsyth 2/21/2025
Release to power company Septic Rec'd Melissa Garber 2/27/2025
Septic Release Inspection Health Dept 2/27/2025
Passed: Building - Final Need Blower Door And Termite Final Prior To Co (all Docs Rec'd 5.7.25)-- 4.23.25 Mg Troy Crews 3/7/2025