Columbia County is committed to ensuring accessibility to this website regardless of disability. If anyone encounters a feature on this website that is inaccessible due to a disability, please contact the County Manger’s Office and the Columbia County Board of County Commissioners at (386) 758-1005. You may also email that office at patrick_weaver@columbiacountyfla.com and provide a brief description of the inaccessible feature. The County will either correct the inaccessible feature or, if correction is not possible due to technical limitations, provide the desired information through alternative means.

Skip to content

Columbia County, FL | Permit Details

Mobile Home Permit
Address 149 SE PATIO GLN
LAKE CITY, FL 32025
Parcel #: 08651-001
Acres: 1.29
Owner: Lake City Park, Llc,
Subdivision:
Zoning: A-3
Flood Zone: X
District: 4
Application #: 65901
Permit #: 000050514
Related Permit: Right-of-Way Access/Driveway:
Submitted: Tuesday, June 18, 2024
Issued: Thursday, August 8, 2024
Expires: Tuesday, February 18, 2025
Completed: Tuesday, February 18, 2025
Status: Completed
Septic Release? Yes
Notes:
*MFE= 1' ABOVE THE ROAD
Job Details
Mobile Home is a: Double Wide
Year Built 1984
How many of bedrooms does this home have? 3
How many bathrooms does this home have? 2
Width (Ft.In) 24
Length (Ft.In) 52
Wind Zone? 2
Serial # gafl2ad31341715
Installation Decal # 108499
Service Amps 200
Residential or Commercial Use? Residential
Driveway access to home: Existing Drive
Are you applying for a 5 year temporary permit? No
Septic # (00-0000) or (X00-000) 24-0499
Dev Permit # F023-
Setbacks Front 30'
Setback Side 1 25'
Setback Side 2 25'
Setbacks Rear 25'
Elevation regulation Minimum Requirement
Finished floor requirement One foot above the road
Fema map number 12023C0401C
Review Notes
6/18/2024 City of Lake City Utilities Notified. City of Lake City Notified of Application within Utility Service Areas LC_GAS, LC_WATER,.
6/21/2024 Zoning Review - Reviewed NEEDED * ENVIRONMENTAL HEALTH SIGNED SITE PLAN OR CITY AVAILABILITY LETTER * # BEDS/BATH ZONING: *MFE= 1' ABOVE THE ROAD
6/24/2024 Plan Review - Reviewed NEEDED * ENVIRONMENTAL HEALTH SIGNED SITE PLAN OR CITY AVAILABILITY LETTER * # BEDS/BATH ZONING: *MFE= 1' ABOVE THE ROAD
6/25/2024 Final Review - Documents Required NEEDED * ENVIRONMENTAL HEALTH SIGNED SITE PLAN * # BEDS/BATH **CALL TO SCHEDULE PREINSPECTION
7/2/2024 Final Review - Documents Required NEEDED * ENVIRONMENTAL HEALTH SIGNED SITE PLAN * # BEDS/BATH **CALL TO SCHEDULE PREINSPECTION
7/9/2024 Final Review - Corrections Needed NEEDED * # BEDS/BATH
7/25/2024 Final Review - Corrections Needed NEEDED: *DRIVEWAY APPROVAL
7/29/2024 Final Review - Corrections Needed NEEDED: *DRIVEWAY APPROVAL
8/1/2024 Final Review - Reviewed
8/1/2024 Final Review - Payment Needed
8/8/2024 Permit Issued Permit #000050514 created and approved.
2/4/2025 Final Review - Payment Needed
Contractors
Name/ Business License Title Role
Rusty L Knowles
Floridas Finest Mobile Home Set Up
IH1038219 Mh Installer (ih) Contractor
Inspections
Inspection Notes Performed By Date
Septic Release Inspection Health Dept 7/3/2024
Failed: Mobile Home - In County Pre-Mobile Home before set-up Nothing Number With This Address. Only Thing Here That Might Need Inspection Is A Double Wide With No Numbers And No Access, Are In Bad State Of Repair On The Exterior Gary Pitzer 7/10/2024
Failed: Mobile Home - In County Pre-Mobile Home before set-up Owner Needs To Send Picture Of Data Plate Prior To Pre Inspection Approval Doors Tied Shut. Mobile Home Will Need Extensive Repairs Prior To Final. Troy Crews 7/10/2024
Passed: Mobile Home - In County Pre-Mobile Home before set-up Numerous Repairs Required Before Final Troy Crews 7/18/2024
Rescheduled 12/11/2024:Mobile Home - Mobile Home Set-Up Final Anthony Aslan 12/9/2024
Cancelled: Engineering - Setbacks Anthony Aslan 12/9/2024
Cancelled: Mobile Home - Mobile Home Set-Up Final Neonta Anderson 12/10/2024
Failed: Mobile Home - Mobile Home Set-Up Final 1. Need To Complete Guard Rails And Handrails On Both Entry Platforms And Steps, 2. Install Lot Numbers On Unit And Corresponding Electric Service. Gary Pitzer 12/13/2024
Passed: Engineering - Setbacks Gary Pitzer 12/13/2024
Failed: Mobile Home - Mobile Home Set-Up Final Need Address Posted On Main Electric Panel, All Balesters Need Complete, Handrails On Both Sides Of Steps Gary Pitzer 2/7/2025
Passed: Engineering - Setbacks Appear To With Lot Gary Pitzer 2/7/2025
Passed: Mobile Home - Mobile Home Set-Up Final Electrical Wires Capped Off Need Proper Outlets Installed-- Rec'd Anthony Aslan 2/13/2025
Passed: Engineering - Setbacks Anthony Aslan 2/13/2025
Release to power company Melissa Garber 2/18/2025
Certificate-Release Certificate Melissa Garber 2/18/2025